Airport buildings construction work
Published
Description
The TE18 Terminal Expansion Project is a construction project which will: — provide an enhanced retail offer through the provision of additional retail units, — improve customer experience by replacing existing sanitary facilities with sufficient larger toilet blocks, — extend the existing baggage make up hall to a sufficient capacity to manage 18 000 0000 passengers per annum (mppa), — provide a new Baggage Handling System (BHS) solution that sits within the TE18 element, — provide sufficient airside goods storage and loading docks to support Airside Goods delivery consolidation to ensure adequate provision for the delivery of goods to airside loading bays, — be designed to be procured in phases or remain flexible to enable the Airport to react as appropriate to changing economic conditions as they emerge. The works will be procured via a number of trade packages which will be grouped together in 'Lots'. • Provision of all temporary services (including lighting power and water) in accordance with specification • All site setting out controls and setting out of all non trade-contractor requirements, for example the road changes to accommodate the installation of the ground works phases. • Supply and install of a fully operational and services welfare facility providing, canteen facilities, changing rooms, toilets and office space. • Provision if logistics support in accordance with detailed scope. • Provision, maintenance and driver provision of 2No construction hoists. 1No passenger and goods, from apron to roof (and floors in between) & 1No goods only hoist from level 10 to 21. • Demolition and removal of the existing Merlin building annex • Demolition and removal of southern single storey section of the bussing lounge • Demolition of existing suspended walkway • Demolition of existing Stair core 46 • All required temporary works associated with the removal of stair case 46 to retail the adjoining switch room • Substructure & concrete floors & underground drainage Concrete Stairs Underground services • All break out of existing apron concrete in a phased manner from grid line R –A and 1-7 • All excavations necessary enable the foundations from grid line R – A and 1-7 • Removal of existing underground obstruction • Removal or redundant underground services • Installation of new underground services and chambers • Casting in of free issue holding down bolts • Installation of concrete works to upper floors, level10. 21 & roof. • Manufacture and install of concrete stairs. • Substructure & concrete floors & underground drainage Concrete Stairs Underground services • All break out of existing apron concrete in a phased manner from grid line R –A and 1-7 • All excavations necessary enable the foundations from grid line R – A and 1-7 • Removal of existing underground obstruction • Removal or redundant underground services • Installation of new underground services and chambers • Casting in of free issue holding down bolts • Installation of concrete works to upper floors, level10. 21 & roof. • Manufacture and install of concrete stairs. • Cladding & Glazing Steel doors Atrium roof Roofing • All associated design, supply and install of required cladding systems • Including all integrated glazing systems • Including all external doors • Supply and install of roofing system, including all membranes, insulation, rainwater outlets and finished membrane. • Supply and install of roofing system to Glulam atrium roof structure • Supply and install of all copings, rainwater outlets and sealing of all service penetrations. • Scaffolding • All common user scaffolding as per agreed scaffolding schedule • Provision of scaffolding services to all trade-contractors that may require it. • Sprinklers MEP Lightning protections Grilles & Louvres IT Systems • Design supply and install of all sprinkler pipework. valves and pumps • Supply and install of all duct work • Supply and install of all electrical installations, including containment, wiring and end devices • Supply and install of all main MEP plant • Testing and commissioning of all services • Connection, testing and commissioning of all lightning protection installation • IT system install, testing and commissioning • Design supply and install of all louvres throughout the building. • Dry lining Brick and blockwork Ceilings Painting Toilets panels FFE Internal Doors Architectural Metalwork • All dry lining works to internal walls, lift shafts and service risers • All required brick and blockwork back of house and front of house walls • All suspended, lay in, feature and solid ceilings, to concourse, back of house and toilet areas. • All required painting to walls and ceiling as per the specific drawings • Design, supply and install of all toilet panelling systems in accordance with the BAL toilet standards • Supply and install of all fixed, bespoke and loose furniture • Supply and install of all internal doors including required ironmongery • Supply and install of all architectural metal work, including stainless steel balustrades and column casings. • Screed Hard & Soft flooring • Design, supply and install all required areas including, concourse, back of house, toilets and retail. • Design supply and install of 2No front of house escalators within the atrium area. • Design supply and install of 2No standard lifts within staircase 46 and VCC01 • Design supply and install of 1No panoramic lift within the atrium area • Manufacture, supply and install required way finding signage with in the building • Manufacture, supply and install of all required emergency signage • Manufacture, supply and install of all airline signage as required • Design, supply and install of all required fire alarm cabling and fire devise, in accordance with the designed fire strategy • Fire stopping • Fire stopping to all vertical service penetrations • Fire stopping to all horizontal service penetrations • Structure fire stopping within risers and plant rooms Living Wall • Supply and install of living wall adjacent to newly installed escalators, Including all required access. Baggage • Design supply and install of baggage conveyors, Make up areas, link in to existing baggage system and all associated specialist baggage IT systems.
Timeline
Publish date
6 years ago
Close date
6 years ago
Buyer information
Birmingham Airport Ltd
- Contact:
- Procurement
- Email:
- procurement@birminghamairport.co.uk
Explore contracts and tenders relating to Birmingham Airport Ltd
Go to buyer profileNotice topics
Source
Ted (OJEU)To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Openclosing
Drumcog Maintenance Framework 2025
Drumcog c/o Pineview Housing AssociationPublished 2 days ago
- Openclosing
GB-Aultbea, Ross-shire, IV22 2HU: OPA T731 OFD Loch Ewe, Electrical Installation Condition Report (EICR)
The Oil and Pipelines Agency37,500 GBPPublished 2 days ago
- Openclosing
Drumcog Maintenance Framework 2025
Drumcog c/o Pineview Housing AssociationPublished 2 days ago
- Openclosing
Framework Agreement for the Installation and Maintenance of Electrical Systems (Domestic and Non-domestic) for Wrexham County Borough Council (All Departments)
Wrexham County Borough CouncilPublished 3 days ago
- Openclosing
SCC - Refurbishments to Play Areas in Multiple Parks within the City of Southend on Sea
Southend-on-Sea Borough CouncilPublished 3 days ago
- Openclosing
SCC - Refurbishments to Play Areas in Multiple Parks within the City of Southend on Sea
Southend-on-Sea Borough CouncilPublished 3 days ago
- Openclosing
Emergency Dangerous Structures Framework
Royal Borough of Kensington and Chelsea50,000,000 GBPPublished 3 days ago
- Openclosing
Framework Agreement for the Installation and Maintenance of Electrical Systems (Domestic and Non-domestic) for Wrexham County Borough Council (All Departments)
Wrexham County Borough CouncilPublished 3 days ago
Explore other contracts published by Birmingham Airport Ltd
Explore more open tenders, recent contract awards and upcoming contract expiries published by Birmingham Airport Ltd.
- Closed
932 - Next Generation Security Equipment (Changes to Cabin Baggage Regulations June 2024)
Birmingham Airport LtdPublished 3 years ago
- Closed
Repair and maintenance services of cooler groups
Birmingham Airport Ltd900,000 GBPPublished 5 years ago
- Closed
Analytical, scientific, mathematical or forecasting software package
Birmingham Airport LtdPublished 5 years ago
Explore more suppliers to Birmingham Airport Ltd
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- University of Liverpool
- Medicines Discovery Catapult
- Grampian Housing Association Ltd
- KNOWLEDGE TRANSFER NETWORK LIMITED
- NHS Stockport Clinical Commissioning Group
- Selnet Ltd
- Lawrence Sheriff School
- Meridian Water - London Borough of Enfield
- E-ACT
- Benchill Primary School
- The Deepings School
- East Northants Council
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.