Stotles logo
Closed

Storm-water piping construction work

Published

Value

4,500,000 GBP

Description

Installation a gravity drainage system to serve the new airfield aprons, parallel taxiway. Drainage system will consist of circa 20 No manholes, varying pipe sizes connecting into a 170 m x 3 m x 2.1 m attenuation chamber, which in turn will be connected to an oil separator and pumping station. The pumping station will pump surface water to a new connection point on the existing surface water system. Due to the construction of the new aprons and parallel taxiway new and amended links are required for the connections to the runway. The works comprise provision of all necessary people, plant, equipment, materials, temporary works and consumables to complete the tie-in works. A new pit and duct system is required to connect the areas of new taxiway and links to the AGL systems. The scope of work within this package will be the pit and duct system which sit in the clear and graded area of the runway connecting into the new pit and duct system being constructed by another contractor. The physical scope of work includes all works necessary to design, supply, manufacture and construct the Airfield Drainage works which includes: — Drainage Drainage scope includes the installation of a gravity drainage system to serve the new airfield aprons, parallel taxiway and amendments to hold 27. The drainage system will consist of circa 20 No manholes, varying pipe sizes connecting into a 170 m long x 3 m wide x 2.1m deep attenuation chamber. The attenuation chamber in turn will be connected to an oil separator and pumping station. The pumping station will pump surface water to a new connection point on the existing surface water system to be located in the region of taxiway Charlie. — Surfacing/ Tie-in works. Due to the construction of the new aprons and parallel taxiway new and amended links are required for the connections to the runway. The works comprise provision of all necessary people, plant, equipment, materials, temporary works and consumables to complete the tie-in works. — Airfield Ground Lighting (AGL) ducting. A new pit and duct system is required to connect the areas of new taxiway and links to the AGL systems. The scope of work within this package will be the pit and duct system which sit in the clear and graded area of the runway connecting into the new pit and duct system being constructed by the Piling and Deck package contractor.

Timeline

Publish date

7 years ago

Close date

7 years ago

Buyer information

London City Airport Ltd

Contact:
Vegain Doola
Email:
Vegain.Doola@londoncityairport.com

Explore contracts and tenders relating to London City Airport Ltd

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by London City Airport Ltd

Explore more open tenders, recent contract awards and upcoming contract expiries published by London City Airport Ltd.

Explore more suppliers to London City Airport Ltd

Sign up