Stotles logo
Closed

Airport buildings construction work

Published

Description

Design and build of Piling, Substructure and Concrete works for the Western Energy Centre, Main Terminal and Terminal Extensions (the Piling and Deck package already procured will provide the foundations for the major part of East Terminal Extension, the New East Pier and the Eastern Energy Centre): — CFA piling (varying diameter, mainly between 300-600 mm on land with a number of steel sleeved 1200 mm diameter in water) with pile caps, — casting of Holding down bolt assemblies (provided by others), — ground beams, — lift, escalator and service Pits, — basements (secant piles and walls), — ground slabs and precast planks, — existing concrete deck demolition and reconstruction, — existing ground beams and pile caps demolition, — grouting for Holding Down bolt assemblies (provided by others), — in-situ reinforced concrete works to metal decking (installed by others), — masonry block walls, — adaptation / local demolition of existing concrete structures to tie in new works. Design and build of Piling, Substructure and Concrete works for the Western Energy Centre, Main Terminal and Terminal Extensions (the Piling and Deck package already procured will provide the foundations for the major part of East Terminal Extension, the New East Pier and the Eastern Energy Centre). Piling works includes: — CFA piling (varying diameter, mainly between 300-600 mm on land with a number of steel sleeved 1200 mm diameter in water) with pile caps, — casting of Holding down bolt assemblies (provided by others). Substructure includes: — ground beams, — lift, escalator and service Pits, — basements (secant piles and walls), — ground slabs and precast planks, — existing concrete deck demolition and reconstruction, — existing ground beams and pile caps demolition. Concrete works include: — grouting for Holding Down bolt assemblies (provided by others), — in-situ reinforced concrete works to metal decking (installed by others), — masonry block walls, — adaptation / local demolition of existing concrete structures to tie in new works.

Timeline

Publish date

7 years ago

Close date

7 years ago

Buyer information

London City Airport Ltd

Contact:
David McCoy
Email:
David.McCoy@londoncityairport.com

Explore contracts and tenders relating to London City Airport Ltd

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by London City Airport Ltd

Explore more open tenders, recent contract awards and upcoming contract expiries published by London City Airport Ltd.

Explore more suppliers to London City Airport Ltd

Sign up