You are reading the Stotles ICS Budget Directory. The aim of this directory is to help public sector suppliers identify the most prosperous target accounts and funded opportunities this fiscal year.
39 of England’s 42 Integrated Care Systems (ICSs) have published Capital Resource Plans, revealing funding sources, capital allocations and confirmed projects for 2023/2024. This budget directory centralises and consolidates this data to provide a single source of truth on funding allocated to ICSs.
Published annually by Integrated Care Board's (ICBs), Capital Resource Plans reveal a "Capital Departmental Expenditure Limit" (CDEL) for their ICS. CDEL's are essentially a combined total budget for the fiscal year.
To help you understand the funding available, we have ranked ICSs by their CDELs below.
Click through on any ICS to access detailed budget summaries for their region, including: funding sources, capital allocations and upcoming projects.
This information was obtained from individual ICS Capital Resource Plans, publicly available on each ICB's public domain.
As of 22/08/2023, the following ICSs have not published publicly accessible capital resource plans and have not been included in this report: Buckinghamshire, Oxfordshire and Berkshire West ICS, Gloucestershire ICS and Greater Manchester ICS.
The table above provides a summary of ICS budgets sourced from Capital Resource Plans.
To help the reader understand how these budgets are typically to authorities within ICSs, this section provides explanatory notes on North West London's capital breakdown as an example case.
With a CDEL of £343m, North West London (NWL) boasts the largest budget of London's 5 ICSs in 2023/2024.
Responsible for equitably distributing capital to the 9 Trusts across their ICS, North West London's Capital Resource Plan reveals how the ICB will allocate funding in the 2023/24 fiscal year.
Below is a summary table of North West London's Capital Resource Plan, showing assumed funding sources and allocations for trusts across the ICS.
For simplicity, the figures are rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access the full capital breakdown, please read the official publication here.
North West London ICS has a total CDEL of £343.5m, including £223.5m of Operational Capital, £86.3m from National Programme funding and £26.2m from New Hospital Programme & upgrades.
These funding sources are evident in the bottom row of the table and are explained below.
NHS trusts use this budget to support ‘business as usual’ schemes, such as backlog maintenance, equipment replacement and IT expenditure. NHS England provide ICB's a capital allocation at the start of the financial year. ICB's are then responsible for distributing it to member trusts based on the needs of their population.
Suppliers working in Medical Technology and IT & Software can target authorities based on these budgets allocations.
National Programme funding is held centrally by NHS England, directed towards trusts priority projects like Targeted Investment Fund, Frontline Digitisation, Diagnostics and Mental Health, among others.
To obtain national programme funding, NHS authorities submit a business case for an upcoming project. If successful, NHS England will confirm a capital allocation. As this budget is designated for specific projects , suppliers should use Capital Resource Plans to qualify the business case before engaging authorities over this budget.
Upgrades and NHP funding is held centrally by NHS England and is allocated to trusts undertaking national strategic projects in building or construction, specifically new hospitals and hospital upgrades.
Suppliers working in construction can target authorities based on these budget allocations.
Other funding includes technical accounting adjustments such as PFI residual interest and the Impact of IFRS 16. In some cases, funding that falls into "Other" may also include small donations, or peppercorn leases.
This is not a specific "budget" to engage over and primarily relates to adjustments based on the previous years spending, and the appreciation/depreciation of held assets.
A CDEL is essentially a total system budget. It is the sum of operational capital, national programme funding, upgrades and NHP and other technical accounting metrics. The final column of the table shows a total CDEL for each member trust, which sums to the total ICS CDEL.
To help you visualise this funding, we have provided an infographic of the capital allocation in North West London below.
As well as confirming funding sources and allocations, Capital Resource Plans also reveals major projects that have received funding for the upcoming year. This section provides further detail on projects funding has been allocated for, and highlights confirmed procurement opportunities that suppliers can pre-engage over.
Below, we've highlighted major ongoing projects and upcoming business cases for 2023/2024 within NWL ICS, confirmed within the Capital Resource Plan.
Details of ongoing projects started in previous fiscal years.
Details of key business cases the ICB plan to submit in 2023/2024.
While this does not capture all the upcoming procurement opportunities in the region, it does provides a strong indicator of the most important strategic projects for NWL ICS. To access a full view of contract opportunities as they emerge from NWL ICS, click the banner below to sign up for Stotles for free.
Now we have demonstrated how to understand NHS financial data, the remainder of this directory provides budget summaries and confirmed procurement projects for each ICS, based on information provided in publicly available Capital Resource Plans.
The ICSs are listed in alphabetical order and can be scrolled through from this point forward. Alternatively, if you are interested in a particular ICS, use the contents bar on the left-hand-side to jump directly to their budget summary.
The table below is a summary version of Bath and North East Somerset, Swindon and Wiltshire ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access the most detailed capital breakdown, read the full plan here.
Bath and North East Somerset, Swindon and Wiltshire ICS has a total CDEL of £154.9m, including £43.3m of Operational capital, £28.8m in NHP & upgrades and £65.4m in National Programme funding.
The Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a summary version of Bedfordshire, Luton and Milton Keynes' Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access the most detailed capital breakdown, read the full plan here.
Bedfordshire, Luton and Milton Keynes ICS has a total CDEL of £115.2m, including £45.8m of Operational Capital, £11.7m in National Programme funding and £57.6m in NHP & upgrades.
The Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a summary version of Birmingham and Solihull ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the full plan here.
Birmingham and Solihull ICS has a total CDEL of £177.1m, including £77.8m of Operational Capital and £51.8m in National Programme funding.
The Capital Resource Plan highlights major projects this capital will be allocated towards, including:
Key schemes which commenced in 2022/23 and which will continue into and be completed in 2023/24, include
The table below is a summary version of Black Country ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Black Country ICS has a total CDEL of £200.8m, including £81.8m of Operational Capital, £32.1m in NHP upgrades and £65m in National Programme funding.
This Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a sumamary version of Bristol, North Somerset and South Gloucestershire ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Bristol, North Somerset and South GloucestershireICS has a total CDEL of £158.3m, including £75.3m of Operational Capital, £6.2m in NHP upgrades and £43.2m in National Programme funding.
This Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a condensed version of Cambridge and Peterborough ICB's Capital Resource Plan.
For simplicity we have removed rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Cambridgeshire and Peterborough ICS has a total CDEL of £159.5m, including £69.3m of Operational Capital, £27.8m in NHP upgrades and £19.7m in National Programme funding.
This Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a condensed version of Cheshire and Merseyside ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Cheshire and Merseyside ICS has a total CDEL of £406.8m, including £242.8m of Operational Capital, £18.2m in NHP upgrades and £121.1m in National Programme Funding. Unfortunately, the plan does not refer to member trusts by name, making it difficult to understand who capital has been allocated towards.
This Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a condensed version of Cornwall and The Isles of Scilly ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Cornwall and The Isles of Scilly ICS has a total CDEL of £102.8m, including £25m of Operational Capital, £28.8m in NHP upgrades and £43.6m in National Programme funding.
This Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a condensed version of Coventry and Warwickshire ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Coventry and Warwickshire ICS has a total CDEL of £87.0m, including £39.7m of Operational Capital and £30.3m in National Programme funding.
This Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a condensed version of Derby and Derbyshire ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Derby and Derbyshire ICS has a total CDEL of £170.9m, including £56.9m of Operational Capital and £83.7m in National Programme funding.
This Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a condensed version of Devon ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Devon ICS has a total CDEL of £277.4m, including £89.3m of Operational Capital, £24.1m in NHP Upgrades and £88.7m in National Programme funding.
This Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a condensed version of Dorset ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Dorset ICS has a total CDEL of £294.7m, including £66.6m of Operational Capital, £107.9m in NHP Upgrades and £100.3m in National Programme funding.
This Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a condensed version of Frimley ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Frimley ICS has a total CDEL of £62.9m, including £40.4m of Operational Capital and £20.7m in National Programme funding.
This Capital Resource Plan highlights major projects this capital will be allocated towards, including:
The table below is a condensed version of Hampshire and Isle of Wight ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Hampshire and Isle of Wight ICS has a total CDEL of £339.3m, including £115.7m of Operational Capital and £136.8m in Public Dividend Capital.
*This Capital Resource Plan does not split Public Dividend Capital by National Programme funding and NHP & upgrades, so we have left this as an aggregated figure for this ICS.*
The plan highlights major projects this capital will be allocated towards, including:
The table below is Herefordshire and Worcestershire ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Herefordshire and Worcestershire ICS has a total CDEL of £80.5m, including £26.7m of Operational Capital and £48.6m in National Programme funding. The ICB did not disclose how this capital will be allocated to member trusts.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of Hertfordshire and West Essex ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Hertfordshire and West Essex ICS has a total CDEL of £186.5m, including £71.6m of Operational Capital, £26.4m of NHP programmes & upgrades and £54.4m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of Humber and North Yorkshire ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Humber and North Yorkshire ICS has a total CDEL of £181.1m, including £82.1m of Operational Capital, £10.9m in NHP upgrades and £76.2m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of Kent and Medway ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Kent and Medway ICS has a total CDEL of £191.2m, including £83.4m of Operational Capital and £56.3m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of Lancashire and South Cumbria ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Lancashire and South Cumbria ICS has a total CDEL of £184.6m, including £118.0m of Operational Capital, £1.2m in NHP upgrades and £52.5m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of Leicester, Leicestershire and Rutland ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Leicester, Leicestershire and Rutland ICS has a total CDEL of £129.4m, including £63.3m of Operational Capital, £1.1m in NHP upgrades and £49.8m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
University Hospitals Leicester NHS Trust:
Leicestershire Partnership NHS Trust’s LPT)
The table below is a condensed version of Lincolnshire ICB's Capital Resource plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Lincolnshire ICS has a total CDEL of £55m, including £31.3m of Operational Capital and £22.3m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of Mid and South Essex ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Mid and South Essex ICS has a total CDEL of £139m, including £66.2m of Operational Capital and £59.3m in National Programme funding.
The ICB has a number of Business Cases in progress or already approved for 2023/24. This includes:
The table below is a condensed version of Norfolk and Waveney's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Norfolk and Waveney ICS has a total CDEL of £42m, entirely comprised of their operational capital allocation.
The ICB did not disclose any major ongoing schemes or business cases for 2023/2024.
The table below is a condensed version of North Central London ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
North Central London ICS has a total CDEL of £329m, including £195.7m of Operational Capital, £71.9m in NHP & upgrades and £39.4m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of North East and North Cumbria ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
North East and North Cumbria ICS has a total CDEL of £393.2m, including £213.9m of Operational Capital, £32.4m in NHP & upgrades and £97.9m in National Programme funding.
This plan does not provide further details on what projects this funding will be allocated towards.
The table below is a condensed version of North East London ICB's Capital Resource plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
North East London ICS has a total CDEL of £252.9m, including £95.3m of Operational Capital, £13.7m in NHP & upgrades and £90.5m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
Specific large schemes include
TIF £40.8m
Community Diagnostic Centres
The table below is a condensed version of Northamptonshire ICB's Capital Resource Plan,
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Northamptonshire ICS has a total CDEL of £69.7m, including £34.2m of Operational Capital, £5.3m in NHP & upgrades and £26.3m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of Nottingham and Nottinghamshire ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest £100,000, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Nottingham and Nottinghamshire ICS has a total CDEL of £222.5m, including £107.7m of Operational Capital, £51.9m in NHP & upgrades and £45.7m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
Nottingham University Hospitals
Sherwood Forest Hospitals
The table below is a condensed version of Shropshire, Telford and Wrekin ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Shropshire, Telford and Wrekin has a total CDEL of £87.0m, including £30.1m of perational al and £51.8m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of Somerset ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
Somerset has a total CDEL of £84.4m, including £32.8m of Operational Capital, £23.0m in NHP & upgrades and £20.2m in national programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of South East London ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
South East London ICS has a total CDEL of £315.2m, including £228.5m of Operational Capital and £38.3m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of South West London ICB's Capital Resource plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access a more detailed capital breakdown, read the plan in full here.
South West London has a total CDEL of £287.7m, including £150.2m of Operational Capital, £28.2m in NHP & upgrades and £33.9m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of South Yorkshire ICB's Capital Resource Plan, available here.
South Yorkshire's Capital Resource Plan does not disclose funding sources according to the standard template. For simplicity, we've provided a streamlined budget summary based on the available information, displayed below.
The plan highlights major initiatives this capital will be allocated towards, including:
Medical:
Digital:
Elective recovery (£100m regionally):
Hospital Upgrades
The table below is a condensed version of Staffordshire and Stoke-on-Trent ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access the full capital breakdown, read the plan here.
Staffordshire and Stoke-on-Trent has a total CDEL of £83.3m, including £53.1m of Operational Capital £36.4m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of Suffolk and North East Essex ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access the full capital breakdown, read the plan here.
Suffolk and North East Essex has a total CDEL of £184.5m, including £61.8m of Operational Capital, £1.0m NHP & upgrades and £125.9m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of Surrey Heartland ICB's Capital Resource Plan. To access the full capital breakdown, read the plan here.
Surrey Heartland's Capital Resource Plan deviates from the standard template by not disclosing specific allocations to its member trusts. Consequently, we've provided a streamlined budget summary based on the available information, displayed below.
Surrey Heartlands has a total CDEL of £122.2m, including £81.5m of Operational Capital and £40.7m of Public Dividend Capital.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of Sussex ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access the full capital breakdown, read the plan here.
Sussex ICS has total CDEL of £229.5m, including £111.6m of Operational Capital, £12.8m in NHP & upgrades and £103.4m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
The table below is a condensed version of West Yorkshire ICB's Capital Resource Plan.
For simplicity we have rounded figures to the nearest hundred thousand, so there may be discrepancies between the total CDEL and the sum of the previous columns. To access the full capital breakdown, read the plan here.
West Yorkshire ICS has a total CDEL of £378.1m, including £171.8m of Operational Capital, £28.6m in NHP upgrades and £96.07m in National Programme funding.
The plan highlights major initiatives this capital will be allocated towards, including:
NHS England:
NHS England provides national leadership for the NHS. They are responsible for the overall strategy and budget setting across the country.
Integrated Care System:
"Integrated care systems (ICSs) are partnerships of organisations that come together to plan and deliver joined up health and care services, and to improve the lives of people who live and work in their area."(NHS England)
Introduced inthe Health and Care Act (2022), 42 ICSs were established across England on a statutory basis on 1 July 2022.
Integrated Care Board:
ICBs are newly formed NHS organisations within each ICS region that manage the functions and budgets for the provision of health services within the ICS.
Integrated care boards (ICBs) replaced clinical commissioning groups (CCGs) in the NHS in England from 1 July 2022.
Capital Resource Plan:
Capital Resource Plans are published annually by ICB's and set out how they will prioritise and spend NHS capital funding to achieve their strategic aims within the fiscal year. These plans outline assumed funding sources, capital allocations, ongoing schemes and upcoming business cases.
Capital Departmental Expenditure Limit:
A CDEL is essentially a total system budget, which cannot be exceeded in the financial year. It is the sum of operational capital, national programme funding, upgrades and NHP and other technical accounting metrics
Operational Capital:
NHS trusts use this budget to support ‘business as usual’ schemes, such as backlog maintenance, equipment replacement and IT expenditure. NHS England provide ICB's a capital allocation at the start of the financial year, who then distribute it to member trusts based on population need.
New Hospital Programme (NHP):
Upgrades and NHP Programme funding is held centrally by NHS England and is allocated to trusts undertaking national strategic projects in building or construction, specifically new hospitals and hospital upgrades.
National Programmes:
National Programme funding is held centrally by NHS England and is allocated to trusts undergoing major projects, considered priority by NHE. Flagship programmes include: Targeted Investment Fund, Frontline Digitisation, Diagnostics and Mental Health, among others.
Business Cases:
These are projects that the ICB are planning to submit for NHS England for approval, before beggining procurement.
Ongoing Schemes:
These are ongoing projects that started in previous financial years.