Bridge Repairs Inversnaid 2024
Published
Buyer
Description
Repair of two argocat bridges at RSPB Inversnaid The successful supplier will supply a service to which the following points will apply: The supplier will replace all wooden elements of two bridges at RSPB Inversnaid reserve. Both bridges use the same design and are made with a framework of galvanised steel on concrete abutments, with timber decking and guardrails. The bridges are in a remote location and are primarily used for argocat access across streams. - All timber elements should be replaced like-for-like in a timber suitably treated for external conditions. Minimum C16 Strength Grade. (also refer to the original specification for the bridges if available) - New timber fixings should be galvanised, replaced on a like-for-like basis. The original construction drawings should be followed including the material schedules shown on drawings. - The contractor undertaking the repairs should review the condition of the steelwork when it is fully exposed (following timber removal) to confirm the findings in the attached report. In particular, attention should be given to the abutments and any other areas where visual survey is currently restricted. - The concrete abutments for each bridge should be viewed during repair works with any signs of distress noted. - All waste materials to be removed from site and disposed of as per regulations. Lot 1: Repair of two argocat bridges at RSPB Inversnaid The successful supplier will supply a service to which the following points will apply: The supplier will replace all wooden elements of two bridges at RSPB Inversnaid reserve. Both bridges use the same design and are made with a framework of galvanised steel on concrete abutments, with timber decking and guardrails. The bridges are in a remote location and are primarily used for argocat access across streams. - All timber elements should be replaced like-for-like in a timber suitably treated for external conditions. Minimum C16 Strength Grade. (also refer to the original specification for the bridges if available) - New timber fixings should be galvanised, replaced on a like-for-like basis. The original construction drawings should be followed including the material schedules shown on drawings. - The contractor undertaking the repairs should review the condition of the steelwork when it is fully exposed (following timber removal) to confirm the findings in the attached report. In particular, attention should be given to the abutments and any other areas where visual survey is currently restricted. - The concrete abutments for each bridge should be viewed during repair works with any signs of distress noted. - All waste materials to be removed from site and disposed of as per regulations. Given the remote nature of the site, it is strongly recommended that suppliers should visit the location before tendering. This can be organised with the Site Manager at fraser.lamont@rspb.org.uk.
Timeline
Publish date
3 months ago
Close date
2 months ago
Buyer information
RSPB Scotland
- Email:
- central.procurement@rspb.org.uk
Explore contracts and tenders relating to RSPB Scotland
Go to buyer profileNotice topic
To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Openclosing
Skew Bridge, Grimsargh - Bridge Widening Works
Lancashire County Council2,200,000 GBPPublished 6 days ago
- Openclosing
Strip, timber and re-deck Gunpower Works Bridge
Bannau Brycheiniog National Park AuthorityPublished 7 days ago
- Openclosing
LUF Betws Y Coed Llanrwst - Sappers Bridge and A470 SUP
Conwy County Borough CouncilPublished a month ago
- Closed
River Tone Footbridge Replacement in Taunton - Design and Consturction
Somerset Council1,350,000 GBPPublished a month ago
- Closed
Buskey House - Bridge Strengthening & Retaining Wall Repair
The North Yorkshire CouncilPublished 2 months ago
- Closed
A98 Banff Bridge Scour Protection Works
Aberdeenshire Council2,000,000 GBPPublished 2 months ago
Explore other contracts published by RSPB Scotland
Explore more open tenders, recent contract awards and upcoming contract expiries published by RSPB Scotland.
- Openclosing
Groundworks and fitting out of new Workshop at RSPB Lochwinnoch
RSPB ScotlandPublished 6 days ago
Explore more suppliers to RSPB Scotland
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- Breckland District Council and South Holland District Council
- London South Bank University
- MInistry of Defence, Defence Business Services (MOD, DBS)
- Limerick 2030 Strategic Development DAC
- Argyll and the Isles Coast and Countryside Trust (ACT)
- Hockerill Anglo-European College
- Hockley Parish Council
- Stirchley & Brookside Parish Council
- Friars Primary School and Nursery
- Newborough and Borough Fen Parish Council
- Cotgrave Town Council Within Cotgrave Leisure Centre
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.