AG0573 - Cyclical Routine Maintenance and Associated Repairs of Foul Water Infrastructure Including Effluent Disposal 2024-2027

Published

Value

3,015,000 GBP

Description

Aster Group has approximately 76 foul water infrastructure assets (Sewage Treatment Plants, septic tanks and pumping stations) serving homes not connected to mains drainage. There is an ongoing requirement to undertake routine maintenance of the foul water assets to ensure correct operation and compliance with Environment Agency discharge consents along with the emptying of septic tanks to provide effluent disposal arrangements for properties served by the installations. This procurement is for the successor arrangement to the current contract which comes to an end in early 2025. The requirement is for the provision of scheduled maintenance, non-scheduled maintenance works (where instructed) and provision of a provision of 24-hour, 365-day out of hours and emergency call out service. Full details of the requirements are set out in the Procurement Documents. Lot 1: Lot 1 - North Hampshire The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 2: Lot 2 - South Hampshire The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 3: Lot 3 - East Dorset The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 4: Lot 4 - West Dorset The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 5: Lot 5 - Devon & Cornwall The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 6: Lot 6 - Somerset The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 7: Lot 7 – Wiltshire The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents.

Timeline

Publish date

3 months ago

Close date

2 months ago

Buyer information

Aster Property Limited

Contact:
Samraj Randhawa
Email:
samraj.randhawa@aster.co.uk

Explore contracts and tenders relating to Aster Property Limited

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by Aster Property Limited

Explore more open tenders, recent contract awards and upcoming contract expiries published by Aster Property Limited.

Explore more suppliers to Aster Property Limited

Sign up