Stotles logo
Openclosing

Traction Power & Earthing Upgrades - Phase 1 Works

Published

Description

TfGM is looking to establish a contract to ascertain current asset condition information & outline design (Phase 1). The current traction return system in the City Centre is already a floating system following the opening of 2nd City Crossing (2CC) in 2017. When the negative return system is floating, protective measures must be in place to protect persons against the risk of electric shock from dangerous voltages (touch or accessible voltages) between the rails and metallic objects or earth within the Overhead Contact Line Zone (OCLZ). At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was “floated” in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be assessed against relevant standards and the Metrolink Infrastructure Technical Specification System Earthing Policy to ensure compliance and any identified non-compliances rectified on site. PIN 2023/S 000-034915 TfGM’s intention is to award works in a phased manner, at this stage only Phase 1 is being tendered. Further information can be found within the Works Information included with the Tender documentation pack. Lot 1: TfGM is looking to establish a contract to ascertain current asset condition information & outline design (Phase 1). The current traction return system in the City Centre is already a floating system following the opening of 2nd City Crossing (2CC) in 2017. When the negative return system is floating, protective measures must be in place to protect persons against the risk of electric shock from dangerous voltages (touch or accessible voltages) between the rails and metallic objects or earth within the Overhead Contact Line Zone (OCLZ). At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was “floated” in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be assessed against relevant standards and the Metrolink Infrastructure Technical Specification System Earthing Policy to ensure compliance and any identified non-compliances rectified on site. PIN 2023/S 000-034915 TfGM’s intention is to award works in a phased manner, at this stage only Phase 1 is being tendered. Further information can be found within the Works Information included with the Tender documentation pack.

Timeline

Publish date

10 days ago

Close date

in 2 months

Buyer information

Transport for Greater Manchester

Contact:
Ms Francesca Hibbert
Email:
francesca.hibbert@tfgm.com

Explore contracts and tenders relating to Transport for Greater Manchester

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by Transport for Greater Manchester

Explore more open tenders, recent contract awards and upcoming contract expiries published by Transport for Greater Manchester.

Explore more suppliers to Transport for Greater Manchester

Sign up