Distilling, filtering or rectifying apparatus
Published
Description
Supply of a plant for the concentration of aqueous extracts from fermented biomass. The plant (evaporator 1 and evaporator 2) should be able to process a daily liquor volume of approx. 36 000 L/d with 8 % TS to a concentrate with approx. 70 % DM. In addition, a pilot plant (evaporator 3) for the evaporation of extracts with a capacity of 5 000-10 000 L/d is to be built, which is suitable for concentrating from 8 % DM up to 60 % DM. Supply of a plant for the concentration of aqueous extracts from fermented biomass. The plant/evaporator should be able to process a daily liquor volume of approx. 36 000 L/d with 8 % TS to a concentrate with approx. 70 % DM. In addition, a pilot plant for the evaporation of extracts with a capacity of 5 000-10 000 L/d is to be built, which is suitable for concentrating from 8 % DM up to 60 % DM. The equipment for concentration must meet the following requirements: 1) special suitability for the product stream; 2) energy efficient operation; 3) process control — high degree of automation for stand-alone operation; 4) CIP — capable and automated cleaning; 5) GMP as well as suitability for the manufacturing of product qualities in the feed/feed additives segment; 6) product handling: no exposure of the product to temperatures > 75 ºC; 7) compactness of the plant — plant might be relocated again after installation. Based on the requirement profile, it is assumed that a combination of different evaporator types is necessary: Lot 1: Evaporator 1: Required fleet volume > 35 000 L/d; concentration from dry matter 8 % to at least dry matter 50 %; concentration factor > 6.25; required evaporation capacity < 1 225 L/h; Lot 2: Evaporator 2 high concentrator: Required fleet volume > 5600 L/d; concentration from dry matter 50 % to dry matter 70 %, concentration factor 1.4; required evaporation capacity < 160 L/h; (app. operating hours 10 h/d); Lot 3: Evaporator 3 Pilot: Separate pilot-scale evaporator; suitable for concentration from 8 % DM up to 60 % DM; required evaporation capacity 5 000-10 000 L/d. Providers can also offer only partial services (individual lots). On-site conditions: sufficient thermal energy is available at the site in the form of hot water at 90 ºC. A supply of saturated steam is optional (would need to be installed). Clear height: 7.0 m; other heights are optional (require installation outdoors or extension to the site). Product information: Aqueous extract from fermented biomass with complex composition; particle-free, 8 % DM; acidic (pH 3.0-pH 5.5), composition of extract may vary. Indicative dynamic viscosity (at 55 ºC, shear rate 500 s-1) in (Pa*s): < 5 (at DM < 30 %), < 50 (DM 55 %); < 3 000 (at DM 75 %). Range of increase in boiling point of the product compared to water at 300 mbar absolute pressure: +2.5 to +5.5 ºC (at DM 45 %-60 %). Supply of a plant for the concentration of aqueous extracts from fermented biomass. The plant/evaporator should be able to process a daily liquor volume of approx. 36 000 L/d with 8 % TS to a concentrate with approx. 70 % DM. In addition, a pilot plant for the evaporation of extracts with a capacity of 5 000-10 000 L/d is to be built, which is suitable for concentrating from 8 % DM up to 60 % DM. The equipment for concentration must meet the following requirements: 1) special suitability for the product stream; 2) energy efficient operation; 3) process control-high degree of automation for stand-alone operation; 4) CIP — capable and automated cleaning; 5) GMP as well as suitability for the manufacturing of product qualities in the feed/feed additives segment; 6) product handling: no exposure of the product to temperatures > 75 ºC; (7) compactness of the plant — plant might be relocated again after installation. Based on the requirement profile, it is assumed that a combination of different evaporator types is necessary: Lot 1: Evaporator 1: Required fleet volume > 35 000 L/d; concentration from dry matter 8 % to at least dry matter 50 %; concentration factor > 6.25; required evaporation capacity < 1 225 L/h; Lot 2: Evaporator 2 high concentrator: Required fleet volume > 5 600 L/d; concentration from dry matter 50 % to dry matter 70 %, concentration factor 1.4; required evaporation capacity < 160 L/h; (app. operating hours 10 h/d); Lot 3: Evaporator 3 Pilot: Separate pilot-scale evaporator; suitable for concentration from 8 % DM up to 60 % DM; required evaporation capacity 5 000-10 000 L/d. Providers can also offer only partial services (individual lots). On-site conditions: sufficient thermal energy is available at the site in the form of hot water at 90 ºC. A supply of saturated steam is optional (would need to be installed). Clear height: 7.0 m; other heights are optional (require installation outdoors or extension to the site). Product information: Aqueous extract from fermented biomass with complex composition; particle-free, 8 % DM; acidic (pH 3.0-pH 5.5), composition of extract may vary. Indicative dynamic viscosity (at 55 ºC, shear rate 500 s-1)in (Pa*s): < 5 (at DM < 30 %), < 50 (DM 55 %); < 3 000 (at DM 75 %). Range of increase in boiling point of the product compared to water at 300 mbar absolute pressure: +2.5 to +5.5 ºC (at DM 45 %-60 %). Supply of a plant for the concentration of aqueous extracts from fermented biomass. The plant/evaporator should be able to process a daily liquor volume of approx. 36 000 L/d with 8 % TS to a concentrate with approx. 70 % DM. In addition, a pilot plant for the evaporation of extracts with a capacity of 5 000-10 000 L/d is to be built, which is suitable for concentrating from 8 % DM up to 60 % DM. The equipment for concentration must meet the following requirements: 1) special suitability for the product stream; 2) energy efficient operation; 3) process control- high degree of automation for stand-alone operation; 4) CIP — capable and automated cleaning; 5) GMP as well as suitability for the manufacturing of product qualities in the feed/feed additives segment; 6) product handling: no exposure of the product to temperatures > 75 ºC, (7) Compactness of the plant- plant might be relocated again after installation. Based on the requirement profile, it is assumed that a combination of different evaporator types is necessary: Lot 1: Evaporator 1: Required fleet volume > 35 000 L/d; concentration from dry matter 8 % to at least dry matter 50 %; concentration factor > 6.25; required evaporation capacity < 1 225 L/h; Lot 2: Evaporator 2 high concentrator: Required fleet volume > 5 600 L/d; Concentration from dry matter 50 % to dry matter 70 %, concentration factor 1.4; required evaporation capacity < 160 L/h; (app. operating hours 10 h/d); Lot 3: Evaporator 3 Pilot: Separate pilot-scale evaporator; suitable for concentration from 8 % DM up to 60 % DM; required evaporation capacity 5 000-10 000 L/d. Providers can also offer only partial services (individual lots). On-site conditions: sufficient thermal energy is available at the site in the form of hot water at 90 ºC. A supply of saturated steam is optional (would need to be installed). Clear height: 7.0 m; other heights are optional (require installation outdoors or extension to the site). Product information: Aqueous extract from fermented biomass with complex composition; particle-free, 8 % DM; acidic (pH 3.0-pH 5.5), composition of extract may vary. Indicative dynamic viscosity (at 55 ºC, shear rate 500 s-1) in (Pa*s): < 5 (at DM < 30 %), < 50 (DM 55 %); < 3 000 (at DM 75 %). Range of increase in boiling point of the product compared to water at 300 mbar absolute pressure: +2.5 to +5.5 ºC (at DM 45 %-60 %).
Timeline
Publish date
4 years ago
Close date
4 years ago
Buyer information
BRID-Biorefinery Research, Implementation and Development Ltd.
- Contact:
- Martine Blaix
- Email:
- martine.blaix@brid.ie
Explore contracts and tenders relating to BRID-Biorefinery Research, Implementation and Development Ltd.
Go to buyer profileNotice topics
Source
Ted (OJEU)To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Openclosing
CFT for the procurement of 5 cider maturation storage tanks for an artisanal cider procedure in Ireland
Legacy Irish Cider100,000 EURPublished 4 days ago
- Openclosing
cheese making equipment - artisan cheesemakers
Hegarty cheese180,000 EURPublished 20 days ago
- Closed
Supply, Delivery, Installation, Commissioning, Training and ongoing support of a fully automated 5HL brewing system.
Teagasc - the Agriculture and Food Development AuthorityPublished 2 months ago
- Closed
Supply, deliver and install a Metal Detector System - Cashel, Co Tipperary
Una O Dwyer LtdPublished 4 months ago
- Closed
Supply, deliver and install 2 pieces of specialist equipment - Cashel, Co Tipperary,
Una O Dwyer LtdPublished 4 months ago
- Closed
GALW/SO1208/2024 Multi-party Framework for the supply, delivery, installation, commissioning, maintenance during the warranty period, training, correct disposal of Heavy Commercial catering equipment
University of Galway (ID 1400)1,800,000 EURPublished 10 months ago
- Closed
REQUEST FOR TENDER – Bean to Bar Cacao Production Equipment and Installation
NibbedPublished a year ago
- Closed
Blakes Always Organic LTD - Milk Processing Equipment
Blakes Always Organic_199242Published a year ago
Explore other contracts published by BRID-Biorefinery Research, Implementation and Development Ltd.
Explore more open tenders, recent contract awards and upcoming contract expiries published by BRID-Biorefinery Research, Implementation and Development Ltd..
- Unknown
Supply of Solid-liquid Extractor for Aqueous Plant Extracts
BRID-Biorefinery Research, Implementation and Development Ltd.Published 4 years ago
- Unknown
Lieferung eines Fest-Flüssig-Extraktors
BRID-Biorefinery Research, Implementation and Development Ltd.Published 4 years ago
- Closed
Sewage presses
BRID-Biorefinery Research, Implementation and Development Ltd.Published 4 years ago
- Closed
Hydraulic presses
BRID-Biorefinery Research, Implementation and Development Ltd.Published 4 years ago
- Closed
Distilling, filtering or rectifying apparatus
BRID-Biorefinery Research, Implementation and Development Ltd.Published 4 years ago
Explore more suppliers to BRID-Biorefinery Research, Implementation and Development Ltd.
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- Rotherham Metropolitan Borough Council
- VisitBritain
- BABCOCK INTERNATIONAL GROUP PLC
- NEL Commissioning Support Unit
- Sport Wales
- Grampian Housing Association Ltd
- Central Housing Investment Consortium Limited ("CHIC")
- Achilles Information Ltd
- Royal Conservatoire of Scotland
- Valuation Office
- Framlingham Town Council
- East Northants Council
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.