Stotles logo
Closed

Distilling, filtering or rectifying apparatus

Published

Description

Supply of a plant for the concentration of aqueous extracts from fermented biomass. The plant (evaporator 1 and evaporator 2) should be able to process a daily liquor volume of approx. 36 000 L/d with 8 % TS to a concentrate with approx. 70 % DM. In addition, a pilot plant (evaporator 3) for the evaporation of extracts with a capacity of 5 000-10 000 L/d is to be built, which is suitable for concentrating from 8 % DM up to 60 % DM. Supply of a plant for the concentration of aqueous extracts from fermented biomass. The plant/evaporator should be able to process a daily liquor volume of approx. 36 000 L/d with 8 % TS to a concentrate with approx. 70 % DM. In addition, a pilot plant for the evaporation of extracts with a capacity of 5 000-10 000 L/d is to be built, which is suitable for concentrating from 8 % DM up to 60 % DM. The equipment for concentration must meet the following requirements: 1) special suitability for the product stream; 2) energy efficient operation; 3) process control — high degree of automation for stand-alone operation; 4) CIP — capable and automated cleaning; 5) GMP as well as suitability for the manufacturing of product qualities in the feed/feed additives segment; 6) product handling: no exposure of the product to temperatures > 75 ºC; 7) compactness of the plant — plant might be relocated again after installation. Based on the requirement profile, it is assumed that a combination of different evaporator types is necessary: Lot 1: Evaporator 1: Required fleet volume > 35 000 L/d; concentration from dry matter 8 % to at least dry matter 50 %; concentration factor > 6.25; required evaporation capacity < 1 225 L/h; Lot 2: Evaporator 2 high concentrator: Required fleet volume > 5600 L/d; concentration from dry matter 50 % to dry matter 70 %, concentration factor 1.4; required evaporation capacity < 160 L/h; (app. operating hours 10 h/d); Lot 3: Evaporator 3 Pilot: Separate pilot-scale evaporator; suitable for concentration from 8 % DM up to 60 % DM; required evaporation capacity 5 000-10 000 L/d. Providers can also offer only partial services (individual lots). On-site conditions: sufficient thermal energy is available at the site in the form of hot water at 90 ºC. A supply of saturated steam is optional (would need to be installed). Clear height: 7.0 m; other heights are optional (require installation outdoors or extension to the site). Product information: Aqueous extract from fermented biomass with complex composition; particle-free, 8 % DM; acidic (pH 3.0-pH 5.5), composition of extract may vary. Indicative dynamic viscosity (at 55 ºC, shear rate 500 s-1) in (Pa*s): < 5 (at DM < 30 %), < 50 (DM 55 %); < 3 000 (at DM 75 %). Range of increase in boiling point of the product compared to water at 300 mbar absolute pressure: +2.5 to +5.5 ºC (at DM 45 %-60 %). Supply of a plant for the concentration of aqueous extracts from fermented biomass. The plant/evaporator should be able to process a daily liquor volume of approx. 36 000 L/d with 8 % TS to a concentrate with approx. 70 % DM. In addition, a pilot plant for the evaporation of extracts with a capacity of 5 000-10 000 L/d is to be built, which is suitable for concentrating from 8 % DM up to 60 % DM. The equipment for concentration must meet the following requirements: 1) special suitability for the product stream; 2) energy efficient operation; 3) process control-high degree of automation for stand-alone operation; 4) CIP — capable and automated cleaning; 5) GMP as well as suitability for the manufacturing of product qualities in the feed/feed additives segment; 6) product handling: no exposure of the product to temperatures > 75 ºC; (7) compactness of the plant — plant might be relocated again after installation. Based on the requirement profile, it is assumed that a combination of different evaporator types is necessary: Lot 1: Evaporator 1: Required fleet volume > 35 000 L/d; concentration from dry matter 8 % to at least dry matter 50 %; concentration factor > 6.25; required evaporation capacity < 1 225 L/h; Lot 2: Evaporator 2 high concentrator: Required fleet volume > 5 600 L/d; concentration from dry matter 50 % to dry matter 70 %, concentration factor 1.4; required evaporation capacity < 160 L/h; (app. operating hours 10 h/d); Lot 3: Evaporator 3 Pilot: Separate pilot-scale evaporator; suitable for concentration from 8 % DM up to 60 % DM; required evaporation capacity 5 000-10 000 L/d. Providers can also offer only partial services (individual lots). On-site conditions: sufficient thermal energy is available at the site in the form of hot water at 90 ºC. A supply of saturated steam is optional (would need to be installed). Clear height: 7.0 m; other heights are optional (require installation outdoors or extension to the site). Product information: Aqueous extract from fermented biomass with complex composition; particle-free, 8 % DM; acidic (pH 3.0-pH 5.5), composition of extract may vary. Indicative dynamic viscosity (at 55 ºC, shear rate 500 s-1)in (Pa*s): < 5 (at DM < 30 %), < 50 (DM 55 %); < 3 000 (at DM 75 %). Range of increase in boiling point of the product compared to water at 300 mbar absolute pressure: +2.5 to +5.5 ºC (at DM 45 %-60 %). Supply of a plant for the concentration of aqueous extracts from fermented biomass. The plant/evaporator should be able to process a daily liquor volume of approx. 36 000 L/d with 8 % TS to a concentrate with approx. 70 % DM. In addition, a pilot plant for the evaporation of extracts with a capacity of 5 000-10 000 L/d is to be built, which is suitable for concentrating from 8 % DM up to 60 % DM. The equipment for concentration must meet the following requirements: 1) special suitability for the product stream; 2) energy efficient operation; 3) process control- high degree of automation for stand-alone operation; 4) CIP — capable and automated cleaning; 5) GMP as well as suitability for the manufacturing of product qualities in the feed/feed additives segment; 6) product handling: no exposure of the product to temperatures > 75 ºC, (7) Compactness of the plant- plant might be relocated again after installation. Based on the requirement profile, it is assumed that a combination of different evaporator types is necessary: Lot 1: Evaporator 1: Required fleet volume > 35 000 L/d; concentration from dry matter 8 % to at least dry matter 50 %; concentration factor > 6.25; required evaporation capacity < 1 225 L/h; Lot 2: Evaporator 2 high concentrator: Required fleet volume > 5 600 L/d; Concentration from dry matter 50 % to dry matter 70 %, concentration factor 1.4; required evaporation capacity < 160 L/h; (app. operating hours 10 h/d); Lot 3: Evaporator 3 Pilot: Separate pilot-scale evaporator; suitable for concentration from 8 % DM up to 60 % DM; required evaporation capacity 5 000-10 000 L/d. Providers can also offer only partial services (individual lots). On-site conditions: sufficient thermal energy is available at the site in the form of hot water at 90 ºC. A supply of saturated steam is optional (would need to be installed). Clear height: 7.0 m; other heights are optional (require installation outdoors or extension to the site). Product information: Aqueous extract from fermented biomass with complex composition; particle-free, 8 % DM; acidic (pH 3.0-pH 5.5), composition of extract may vary. Indicative dynamic viscosity (at 55 ºC, shear rate 500 s-1) in (Pa*s): < 5 (at DM < 30 %), < 50 (DM 55 %); < 3 000 (at DM 75 %). Range of increase in boiling point of the product compared to water at 300 mbar absolute pressure: +2.5 to +5.5 ºC (at DM 45 %-60 %).

Timeline

Publish date

4 years ago

Close date

4 years ago

Buyer information

BRID-Biorefinery Research, Implementation and Development Ltd.

Contact:
Martine Blaix
Email:
martine.blaix@brid.ie

Explore contracts and tenders relating to BRID-Biorefinery Research, Implementation and Development Ltd.

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by BRID-Biorefinery Research, Implementation and Development Ltd.

Explore more open tenders, recent contract awards and upcoming contract expiries published by BRID-Biorefinery Research, Implementation and Development Ltd..

Explore more suppliers to BRID-Biorefinery Research, Implementation and Development Ltd.

Sign up