Barnsley Institute of Technology Project
Published
Buyer
Value
Description
Refurbishment and fit out of an existing College building to create new Institute of Technology teaching spaces along with construction of 3-tiered mezzanine floors and skylight roof structure providing new learning resource facilities. Currently designed to RIBA Stage 4 with full Planning Permission granted along with Building Regulations approval. The works shall include but not be limited to; - Strip out works. - Demolition and dismantling. - Drainage & groundworks. - Fabrication, and erection of structural steelwork. - Replacement roof fabric to existing building. - Installation of a new skylight roof. - Interior fit out and refurbishment. - New MEP building services throughout. - Sustainability elements - whole fabric approach. Lot 1: Barnsley College is committed to the delivery of a state-of-the art DfE Institute of Technology at the Church Street Campus (University Centre) building to enhance the delivery of Higher Education technical qualifications. The Church Street building is located within Barnsley town centre, opened in 1932 as the Barnsley Mining and Technical College. The building is constrained by public roads on all 4 sides, and will present challenges from a logistics and construction perspective. The building requires a high standard of fit out and refurbishment works, along with new build construction of a structural steel frame with 3 mezzanine floors within the existing courtyard creating a glazed roof central Atrium, providing new Learning Resource Centre (LRC) facilities, study areas, and modern cafe and catering facilities. Existing dated classrooms on 2 levels will be transformed into technology-rich learning spaces with Immersive, High-Tech ACad, and ICT suites, with flexibility and adaptability as key requirements. The existing main entrance will maximise the synergy of the beautiful external architecture and the stone steps leading into a striking and modern reception, with new glazed panels allowing students and visitors to see into the building and get a sense that they have entered an outstanding and high-spec educational facility. The Employers' vision is to combine the texture, and richness of existing architecture and features, with contemporary high-quality finishes that creates a connection to the heritage of the building. The Employers' expectation is for the contractor to provide innovative concepts and cost-effective methods and materials to achieve this. The scope of works to deliver and realise the Employer's vision is extensive and shall include but not be limited to: - Light and heavy strip out works throughout, including building - services, sanitary ware, ceiling grids and floor finishes and I.o.T - designated rooms and circulation areas etc. - Demolition and dismantling of existing walls and structures. - New below ground drainage and groundworks to the existing ground floor slab in the Atrium. - Construction of new foundations within the courtyard area. - Fabrication and erection of structural steel frame and mezzanine decks within the existing courtyard (the new Atrium). - Roof fabric replacement and upgrade. - Manufacture and installation of a new skylight roof section at building roof level. - Light and medium interior fitout and refurbishment to I.o.T spaces including circulation areas, new ceilings and floor finishes, partition walls, curtain walls, and new floor to ceiling IPS WC's throughout etc. - New building services throughout, including VRF system, AHU, HVAC, LTHW, DCWS, fire and Intruder, electrical MV and LV systems and IT network infrastructure etc. - Sustainability elements, whole fabric approach. Lot 1: Barnsley College is committed to the delivery of a state-of-the art DfE Institute of Technology at the Church Street Campus (University Centre) building to enhance the delivery of Higher Education technical qualifications. The Church Street building is located within Barnsley town centre, opened in 1932 as the Barnsley Mining and Technical College. The building is constrained by public roads on all 4 sides, and will present challenges from a logistics and construction perspective. The building requires a high standard of fit out and refurbishment works, along with new build construction of a structural steel frame with 3 mezzanine floors within the existing courtyard creating a glazed roof central Atrium, providing new Learning Resource Centre (LRC) facilities, study areas, and modern cafe and catering facilities. Existing dated classrooms on 2 levels will be transformed into technology-rich learning spaces with Immersive, High-Tech ACad, and ICT suites, with flexibility and adaptability as key requirements. The existing main entrance will maximise the synergy of the beautiful external architecture and the stone steps leading into a striking and modern reception, with new glazed panels allowing students and visitors to see into the building and get a sense that they have entered an outstanding and high-spec educational facility. The Employers' vision is to combine the texture, and richness of existing architecture and features, with contemporary high-quality finishes that creates a connection to the heritage of the building. The Employers' expectation is for the contractor to provide innovative concepts and cost-effective methods and materials to achieve this. The scope of works to deliver and realise the Employer's vision is extensive and shall include but not be limited to: - Light and heavy strip out works throughout, including building - services, sanitary ware, ceiling grids and floor finishes and I.o.T - designated rooms and circulation areas etc. - Demolition and dismantling of existing walls and structures. - New below ground drainage and groundworks to the existing ground floor slab in the Atrium. - Construction of new foundations within the courtyard area. - Fabrication and erection of structural steel frame and mezzanine decks within the existing courtyard (the new Atrium). - Roof fabric replacement and upgrade. - Manufacture and installation of a new skylight roof section at building roof level. - Light and medium interior fitout and refurbishment to I.o.T spaces including circulation areas, new ceilings and floor finishes, partition walls, curtain walls, and new floor to ceiling IPS WC's throughout etc. - New building services throughout, including VRF system, AHU, HVAC, LTHW, DCWS, fire and Intruder, electrical MV and LV systems and IT network infrastructure etc. - Sustainability elements, whole fabric approach.
Timeline
Publish date
11 months ago
Close date
10 months ago
Buyer information
Barnsley College
- Contact:
- Paul Langton
- Email:
- p.langton@barnsley.ac.uk
Explore contracts and tenders relating to Barnsley College
Go to buyer profileNotice topic
Source
"Find-a-Tender"To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Openclosing
Refurbishment: WC Upgrades Bay Library Male WC, Grove Female & Male WC
Swansea UniversityPublished today
- Openclosing
The Construction of a 4G Surface to existing MUGA at Sofrydd Primary School
Blaenau Gwent County Borough CouncilPublished today
- Openclosing
National Maintenance, Responsive Repairs and Void works (Regions)
Progress Housing Group12,600,000 GBPPublished today
- Openclosing
The repair and architectural reinstatement of five historic shopfronts and one commercial elevation
Cyngor Sir Ynys MonPublished today
Explore other contracts published by Barnsley College
Explore more open tenders, recent contract awards and upcoming contract expiries published by Barnsley College.
Explore more suppliers to Barnsley College
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- High Peak Borough Council & Staffordshire Moorlands District Council
- Grampian Housing Association Ltd
- Morley Memorial Primary School
- NHS Supply Chain: Food is operated by Foodbuy Europe Ltd, as agent, for and on behalf of Supply Chain Coordination Ltd (‘SCCL’)
- Dales Academies Trust
- University of Newcastle Upon Tyne
- Framlingham Town Council
- Hardwicke Parochial Priamry School
- Mental Health Concern
- St Martin's Multi Academy Trust
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.