Stotles logo
Openclosing

Bóthar Guidel Pedestrian and Cycle Bridge

Published

Description

The proposed works involve the construction of a dedicated pedestrian and cycle bridge on the eastern side and downstream of the existing Bothar Guidel Road Bridge (R612) and includie the following: • Construction of a single-span pedestrian and cycle bridge (effective width of five meters) over the Owenabue River downstream of the existing Bothar Guidel Road Bridge in Carrigaline. • Alterations to existing stone masonry wall on the southern approach to the bridge to facilitate the footpath and approach spans to the proposed bridge. • New signage, ducting and LED lighting. • New six-metre-long slatted timber bench on the proposed pedestrian and cycle bridge. • Upgrading of existing footpaths at the tie-in points at Crosshaven Road and Bother Guidel Road and a tie-in to the public amenity area on Owenabue River embankment. • All associated site development and landscaping works. The deck of the bridge will comprise of a concrete slab that will be surfaced with an asphalt surface course. The handrails will be constructed of stainless steel. The support structure of the bridge will be two precast concrete girders and will be fabricated off site. The proposed bridge and associated infrastructure will be permanent. The proposed works involve the construction of a dedicated pedestrian and cycle bridge on the eastern side and downstream of the existing Bothar Guidel Road Bridge (R612) and includie the following: • Construction of a single-span pedestrian and cycle bridge (effective width of five meters) over the Owenabue River downstream of the existing Bothar Guidel Road Bridge in Carrigaline. • Alterations to existing stone masonry wall on the southern approach to the bridge to facilitate the footpath and approach spans to the proposed bridge. • New signage, ducting and LED lighting. • New six-metre-long slatted timber bench on the proposed pedestrian and cycle bridge. • Upgrading of existing footpaths at the tie-in points at Crosshaven Road and Bother Guidel Road and a tie-in to the public amenity area on Owenabue River embankment. • All associated site development and landscaping works. The deck of the bridge will comprise of a concrete slab that will be surfaced with an asphalt surface course. The handrails will be constructed of stainless steel. The support structure of the bridge will be two precast concrete girders and will be fabricated off site. The proposed bridge and associated infrastructure will be permanent.

Timeline

Publish date

2 days ago

Close date

in 25 days

Buyer information

Cork County Council

Contact:
Cork County Council

Explore contracts and tenders relating to Cork County Council

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by Cork County Council

Explore more open tenders, recent contract awards and upcoming contract expiries published by Cork County Council.

Explore more suppliers to Cork County Council

Sign up