The Danish Parliament has tasked Energinet with undertaking metocean surveys for the development of five offshore wind project areas in Danish waters. The measurements from the metocean surveys will be used as input to various environmental, metocean, and other studies and analyses to support the project development and design process, including energy yield calculations, site assessment, selection and design of foundation, grid connections, cable corridors, etc. The current tender concern LiDAR measurements for the future offshore wind farm areas in Kattegat Sea, North Sea and Baltic Sea. Lot 1: Kattegat II and Hesselø South Two floating LiDAR buoys must be deployed in the future offshore wind farm areas in Kattegat, while one additional buoy must be kept in reserve for contingency. The LiDAR buoys shall measure 12 months of wind speed and direction. Also, oceanographic data (waves, sea current, water level) shall be measured in the same location The overall objectives of the services are as follows (for each buoy): 1. Deploy fully equipped buoy at the agreed location 2. Provide necessary traceability documentation (calibration certificates, validation reports, acceptance tests, and other conformity documents) to ensure quality and traceability of measurements for later use in site assessment studies. 3. Ensure that the buoy is monitored and serviced periodically to ensure the equipment remains functional and ensure high availability and delivery of the measurement data. 4. Undertake necessary repairs to the equipment free of charge, to ensure high availability and delivery of measurement data. 5. To deliver the data to Energinet in electronic format. Lot 2: Kriegers Flak II Two floating LiDAR buoys must be deployed in the future offshore wind farm areas in the Baltic Sea, while one additional buoy must be kept in reserve for contingency. The LiDAR buoys shall measure 12 months of wind speed and direction. Also, oceanographic data (waves, sea current, water level) shall be measured in the same location. The overall objectives of the services are as follows (for each buoy): 1. Deploy fully equipped buoy at the agreed location 2. Provide necessary traceability documentation (calibration certificates, validation reports, acceptance tests, and other conformity documents) to ensure quality and traceability of measurements for later use in site assessment studies. 3. Ensure that the buoy is monitored and serviced periodically to ensure the equipment remains functional and ensure high availability and delivery of the measurement data. 4. Undertake necessary repairs to the equipment free of charge, to ensure high availability and delivery of measurement data. 5. To deliver the data to Energinet in electronic format. Lot 3: North Sea I Three floating LiDAR buoys must be deployed in the future offshore Wind Farm area in the North Sea, while one additional buoy must be kept in reserve for contingency. The LiDAR buoys shall measure 12 months of wind speed and direction. Also, oceanographic data (waves, sea current, water level) shall be measured in the same location The overall objectives of the services are as follows (for each buoy): 1. Deploy fully equipped buoy at the agreed location 2. Provide necessary traceability documentation (calibration certificates, valida-tion reports, acceptance tests, and other conformity documents) to ensure quality and traceability of measurements for later use in site assessment studies. 3. Ensure that the buoy is monitored and serviced periodically to ensure the equipment remains functional and ensure high availability and delivery of the measurement data. 4. Undertake necessary repairs to the equipment free of charge, to ensure high availability and delivery of measurement data. 5. To deliver the data to Energinet in electronic format. Lot 1: Kattegat II and Hesselø South Two floating LiDAR buoys must be deployed in the future offshore wind farm areas in Kattegat, while one additional buoy must be kept in reserve for contingency. The LiDAR buoys shall measure 12 months of wind speed and direction. Also, oceanographic data (waves, sea current, water level) shall be measured in the same location The overall objectives of the services are as follows (for each buoy): 1. Deploy fully equipped buoy at the agreed location 2. Provide necessary traceability documentation (calibration certificates, validation reports, acceptance tests, and other conformity documents) to ensure quality and traceability of measurements for later use in site assessment studies. 3. Ensure that the buoy is monitored and serviced periodically to ensure the equipment remains functional and ensure high availability and delivery of the measurement data. 4. Undertake necessary repairs to the equipment free of charge, to ensure high availability and delivery of measurement data. 5. To deliver the data to Energinet in electronic format. Lot 2: Kriegers Flak II Two floating LiDAR buoys must be deployed in the future offshore wind farm areas in the Baltic Sea, while one additional buoy must be kept in reserve for contingency. The LiDAR buoys shall measure 12 months of wind speed and direction. Also, oceanographic data (waves, sea current, water level) shall be measured in the same location. The overall objectives of the services are as follows (for each buoy): 1. Deploy fully equipped buoy at the agreed location 2. Provide necessary traceability documentation (calibration certificates, validation reports, acceptance tests, and other conformity documents) to ensure quality and traceability of measurements for later use in site assessment studies. 3. Ensure that the buoy is monitored and serviced periodically to ensure the equipment remains functional and ensure high availability and delivery of the measurement data. 4. Undertake necessary repairs to the equipment free of charge, to ensure high availability and delivery of measurement data. 5. To deliver the data to Energinet in electronic format. Lot 3: North Sea I Three floating LiDAR buoys must be deployed in the future offshore Wind Farm area in the North Sea, while one additional buoy must be kept in reserve for contingency. The LiDAR buoys shall measure 12 months of wind speed and direction. Also, oceanographic data (waves, sea current, water level) shall be measured in the same location The overall objectives of the services are as follows (for each buoy): 1. Deploy fully equipped buoy at the agreed location 2. Provide necessary traceability documentation (calibration certificates, valida-tion reports, acceptance tests, and other conformity documents) to ensure quality and traceability of measurements for later use in site assessment studies. 3. Ensure that the buoy is monitored and serviced periodically to ensure the equipment remains functional and ensure high availability and delivery of the measurement data. 4. Undertake necessary repairs to the equipment free of charge, to ensure high availability and delivery of measurement data. 5. To deliver the data to Energinet in electronic format.
Timeline
Publish date
2 years ago
Buyer information
Energinet Eltransmission A/S
- Contact:
- K
- Email:
- procurement@energinet.dk
Explore contracts and tenders relating to Energinet Eltransmission A/S
Go to buyer profileNotice topics
Source
Ted (OJEU)To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Closed
Rammeaftale vedrørende eftersyn og vedligeholdelse af offshore-anlæg
EnerginetPublished 7 months ago
- Closed
GPS-trackingsystem med tilhørende udstyr samt implementering, drift, vedligehold, support, tilpasning/udvikling og rådgivning.
BanedanmarkPublished 8 months ago
- Closed
GPS-trackingsystem med tilhørende udstyr samt implementering, drift, vedligehold, support, tilpasning/udvikling og rådgivning.
BanedanmarkPublished 10 months ago
- Closed
Site Metocean Conditions Assessments for Danish Offshore Wind 2030
EnerginetPublished 12 months ago
- Closed
Rammeaftale vedrørende levering af sporingssystem og tilhørende sporingsenheder til Aalborg Kommunes plejehjem
Aalborg Kommune6,000,000 DKKPublished a year ago
- Unknown
Viking Link - After Installation Survey for Offshore cable
Energinet Eltransmission A/SPublished 2 years ago
Explore more suppliers to Energinet Eltransmission A/S
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- Moorfields Eye Hospital NHS Foundation Trust
- Her Majesty’s Passport Office (HMPO)
- Arts University Bournemouth
- NHS Nottingham & Nottinghamshire CCG
- Northern Ireland Blood Transfusion Service
- Yorkshire 2019 Ltd
- EPPING TOWN COUNCIL
- Drapers' Academy
- St Birinus School
- Shrewsbury Colleges Group
- Mental Health Concern
- Woodfield Academy and Oak Hill First School
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.