Stotles logo
Openclosing

Est Construction Merlin Park University Hospital Galway Block A Energy Upgrade Project - ReRoofing and Renovation Works

Published

Description

Re-Roofing and Renovation Works at Block A, Merlin Park Hospital, Galway for Health Service Executive. Block A is a three-storey administration block to the north of the hospital site. The subject site is bounded to the north and west by Merlin Park Woods and is surrounded to the south and east by various hospital campus buildings (both administrative/educational, and medical) which will remain in use. The proposed works incorporate up-grade works to existing varying types of flat roofs of the Block A Building. The building will remain in use during the works. The works associated with this contract include but is not limited to the following: ● The demolition of a section of sheltered area on the 4th floor roof – Elements making up this structure to be demolished include a section of concrete and masonry wall including concrete wall capping, an in-situ concrete roof (up to 300mm deep), a concrete drop beam which connects a number of structural concrete columns, the concrete columns, additional concrete wall capping on the southern elevation, concrete paviors. ● Installation of new insulated bitumen roof system, ● Installation of new gutter/rainwater systems and aluminium facias, ● Installation of new aluminium parapet cappings, ● Installation of new guardrails to selected existing parapets, ● Installation of new circular rooflights to replace existing, ● Partial demolition, recapping and venting of existing chimneys, ● Installation of new ballasted edge protection w/ integrated walkway, ● Installation of PV panels ● Internal works for installation of containment for pipework and cabling and associated firestopping, the builders work for these will require some concrete cutting coring. Some of the required opes are letterbox 700 x 200 opes and will require installation of lentils and TWD for same. ● Removal and reinstatement of existing CATV service cabling and antennae on the roof to allow new roof insulation to be installed. ● Relocation of existing air conditioning systems and associated ME works ● Relocation of a number of ME items on roof and re-connecting Re-Roofing and Renovation Works at Block A, Merlin Park Hospital, Galway for Health Service Executive. Block A is a three-storey administration block to the north of the hospital site. The subject site is bounded to the north and west by Merlin Park Woods and is surrounded to the south and east by various hospital campus buildings (both administrative/educational, and medical) which will remain in use. The proposed works incorporate up-grade works to existing varying types of flat roofs of the Block A Building. The building will remain in use during the works. The works associated with this contract include but is not limited to the following: ● The demolition of a section of sheltered area on the 4th floor roof – Elements making up this structure to be demolished include a section of concrete and masonry wall including concrete wall capping, an in-situ concrete roof (up to 300mm deep), a concrete drop beam which connects a number of structural concrete columns, the concrete columns, additional concrete wall capping on the southern elevation, concrete paviors. ● Installation of new insulated bitumen roof system, ● Installation of new gutter/rainwater systems and aluminium facias, ● Installation of new aluminium parapet cappings, ● Installation of new guardrails to selected existing parapets, ● Installation of new circular rooflights to replace existing, ● Partial demolition, recapping and venting of existing chimneys, ● Installation of new ballasted edge protection w/ integrated walkway, ● Installation of PV panels ● Internal works for installation of containment for pipework and cabling and associated firestopping, the builders work for these will require some concrete cutting coring. Some of the required opes are letterbox 700 x 200 opes and will require installation of lentils and TWD for same. ● Removal and reinstatement of existing CATV service cabling and antennae on the roof to allow new roof insulation to be installed. ● Relocation of existing air conditioning systems and associated ME works ● Relocation of a number of ME items on roof and re-connecting

Timeline

Publish date

12 days ago

Close date

in 9 days

Buyer information

Health Service Executive (HSE)

Contact:
Health Service Executive (HSE)
Email:
procurement.helpdesk@hse.ie

Explore contracts and tenders relating to Health Service Executive (HSE)

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by Health Service Executive (HSE)

Explore more open tenders, recent contract awards and upcoming contract expiries published by Health Service Executive (HSE).

Explore more suppliers to Health Service Executive (HSE)

Sign up