Scottish Trunk Road Network Maintenance Contract - North West Unit
Published
Description
The focus of the Cromarty Bridge Phase 3 Refurbishment works is to minimise traffic disruption. All works above deck will be completed at night or during weekends for specific tasks. Permanent Works The refurbishment permanent works are as follows: 1. Replace bridge bearings at piers 8, 9 and 10. 2. Removal and replacement of surfacing and waterproofing local to bridge joints at piers 8, 9 and 10. Note, the existing waterproofing is bitumen based and contains Chrysotile Asbestos. 3. Excavation and installation of continuity joints on piers 8 and 9 to form a three-span continuous deck module. 4. Replace gullies adjacent to the bridge joints at piers 8, 9 and 10. 5. Replace expansion joint at pier 10. 6. Concrete repairs as required to the substructure at piers 8, 9 and 10. 7. Install Cathodic Protection system on piers 8, 9 and 10 (above and below the bridge deck). 8. Apply Pavix CCC100 or similar approved to pre-stressed beams on spans 9, 10 and 11. 9. Sever dowel bars after new bearings have been installed and the continuity slabs have achieved 85% of specified compressive strength. Temporary Works The Sub-Contractor shall include the cost of all temporary works within in the permanent works rates. As a minimum, these will include the following: 1. The topside works on the bridge deck will be completed by installing temporary bridging plates to allow traffic to flow in both directions with a 30mph speed restriction from 0600 to 1900. At night (1900 to 0600), the temporary bridging plates will be removed from a single carriageway and shuttle/convoy working Traffic Management (TM) installed to complete the topside permanent works. 2. A temporary mobile access/working platform will be installed underneath each pier to complete the permanent works underneath the bridge. The temporary platform will have to be installed prior to the hydro-demolition of the concrete bridge deck to “catch” wastewater and prevent it entering the watercourse untreated. Access to the temporary platform will be from either the western footpath or vessel adjacent to the bridge (i.e. barge, jack-up barge etc.). No plant or equipment can be stored on the bridge deck as both carriageways and the footpath will remain open during daytime hours. The works below deck are only permitted during daylight hours (0700 to 1900). 3. To replace the bridge bearings, the bridge will have to be temporarily jacked whilst the bearings are replaced. Traffic Management 1. The Sub-Contractor shall include the cost of all traffic management to ensure no full road closure within the cost of the permanent works rates. 2. The Sub-Contractor is to establish convoy or shuttle working traffic management on the carriageway at night or specified weekends as required. 3. A daytime traffic management presence will be required at all times to escort abnormal vehicles over the site location for the duration of the works. 4. Light and heavy recovery vehicles are required to be present on site for the duration of the works on the bridge deck until the topside works on the bridge deck are complete. 5. Only ad-hoc night-time traffic management will be permitted once topside works are complete. 6. Mobile VMS signs will be required at either end of the bridge to update the public with delays and progress. The VMS signs can be removed once the topside works on the bridge deck are complete. Environmental Constraints Marine Licence, CAR Licence, SEMP. Programme Timely completion of the works on the bridge deck is essential for this scheme to minimise traffic disruption. Works on the carriageway shall be completed at night or at weekends.
Timeline
Publish date
a month ago
Close date
25 days ago
Buyer information
BEAR Scotland Limited
- Email:
- mgodsell@bearscotland.co.uk
Explore contracts and tenders relating to BEAR Scotland Limited
Go to buyer profileNotice topics
Tender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Openclosing
Street Parish Council - Street Skate Park Pedestrian Footbridge REPAIR OR REPLACEMENT
Street Parish Council
Published 15 days ago
- Openclosing
Earley Station Footbridge Refurbishment Work
Wokingham Borough Council
2,650,000 GBP
Published 18 days ago
- Openclosing
Earley Station Footbridge Refurbishment Work
Wokingham Borough Council
Published 18 days ago
- Openclosing
CWC24090 - Highways Structures Repairs Framework
Wolverhampton City Council
20,000,000 GBP
Published 18 days ago
- Openclosing
CWC24090 - Highways Structures Repairs Framework
Wolverhampton City Council
20,000,000 GBP
Published 18 days ago
- Openclosing
CHIC Multiple Elements of the Built Environment Framework [2025-2029]
Communities and Housing Investment Consortium Limited
Published 19 days ago
- Openclosing
Highways and Public Realm Contract
Westminster City Council
1,250,000,000 GBP
Published 19 days ago
Explore other contracts published by BEAR Scotland Limited
Explore more open tenders, recent contract awards and upcoming contract expiries published by BEAR Scotland Limited.
- Closed
Scottish Trunk Road Network Maintenance Contract - South East Unit
BEAR Scotland Limited
Published a month ago
- Closed
Scottish Trunk Road Network Maintenance Contract - South East Unit
BEAR Scotland Limited
Published a month ago
- Closed
Scottish Trunk Road Network Management Contract - South East Unit
BEAR Scotland Limited
Published 2 months ago
- Closed
Scottish Trunk Road Network Management Contract - South East Unit
BEAR Scotland Limited
Published 2 months ago
- Openclosing
Scottish Trunk Road Network Management Contract - South East Unit
BEAR Scotland Limited
Published 2 months ago
- Closed
Scottish Trunk Road Network Management Contract - South East Unit
BEAR Scotland Limited
Published 4 months ago
- Closed
Forth Road Bridge – Main Cable Internal Inspection 2025
BEAR Scotland Limited
Published a year ago
- Closed
Scottish Trunk Road Network - North West Unit - A82 Glen Gloy Retaining Wall
BEAR Scotland Limited
Published 2 years ago
- Closed
Scottish Trunk Road Network - South East Unit - Forth Road Bridge - SSUDA Phase 9
BEAR Scotland Limited
Published 2 years ago
Explore more suppliers to BEAR Scotland Limited
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- Newcastle University
- Lincolnshire Housing Partnership
- Irish Blood Transfusion Service
- Settle
- Airedale NHS Foundation Trust
- EPPING TOWN COUNCIL
- Department of the Taoiseach
- STONEHOUSE TOWN COUNCIL
- Bovey Tracey Town Council
- Hethersett Parish Council
- Shaftesbury School
- Stalham Town Council
- St James CofE Primary School
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.