Services related to the oil and gas industry
Published
Value
Description
Through the establishment of the present framework agreement, the contracting authority wants to purchase the supply of onshore intervention services related to wells on natural gas storage. The tendered framework agreement consists of 3 lots and tenders may be submitted for all lots. The tendered framework agreements duration is 5 years with an option to extend for 3 x 1 year. Lot 1: Pulsed neutron logging and data interpretation; Lot 2: Wireline Intervention covering slick line, E-Line and fishing operations; Lot 3: Coil tubing, fluid and nitrogen pumping. The tender involves a joint procurement including the parties mentioned in section I.1). As an option the tendered frame agreement may also be entered by new entities within the Energinet group, cf. section II.2.11). The procurement is conducted as a negotiated procedure and there will be entered into a framework agreement with one provider. Pulsed neutron logging and data interpretation, cf. Appendix 2 (doc. No 20/07449-4) and Appendix 2A (doc. No 20/07449-5): The main objective of the logging is to check for gas leakages from the Gassum Formation up into the caprock. The secondary objectives are to measure the thickness and saturation of the gas in the storage zones and to measure total depth to check for sand fill. The results will be used e.g., for operating the wells and their productivity. The number of wells to be logged varies from year to year, but the average number is expected to be 6 wells per year. The interval to be logged is from a few meters above the top of upper sand layer in the caprock to total depth of the reservoir. During the pulsed neutron logging the tubing head pressure/temperature and the pres-sure/temperature at top of perforations shall be measured and reported. The interpretation of the logs must determine the gas saturation as a function of depth. It is important that the new logs can be compared directly with previous logs as the main objective is to detect changes which could indicate gas in the caprock. Gas Storage Den-mark will supply the data from the open hole logs and the previous pulsed neutron logs to enable the service company to plot the new log on top of the old logs. The tender involves a joint procurement including the parties mentioned in section I.1). As an option the tendered frame agreement may also be entered by new entities within the Energinet group, cf. section II.2.11). The procurement is conducted as a negotiated procedure and there will be entered into a framework agreement with one provider. Wireline Intervention covering slick line, E-Line and fishing operations, cf. Appendix 2 (doc. No 20/08782-1) and Appendix 2A (doc. No 20/08782-3): Intervention jobs based on Wireline conveyed, well consulting services and engineering support. The service company shall review, prepare, and mobilise equipment, personnel, and services to perform the work as required for Gas Storage Denmark. The equipment and personnel provided shall be suitable to perform the activities Necessary and usual for natural gas storage in standard 3 000 psi wells including: • electric line (up to 5/16” mono-conductor) cased whole logging services; • general slick line and braided line intervention work; • heavy duty braided line for fishing services; • technical assistance on Gas Storage Denmark’s office duties: the service company shall when required provide onshore project management, well design engineer and engineering support. This work shall be to assist Gas Storage Denmark’s operation planning, well design, intervention, technology qualification and/or studies. The tender involves a joint procurement including the parties mentioned in section I.1). As an option the tendered frame agreement may also be entered by new entities within the Energinet group, cf. section II.2.11). The procurement is conducted as a negotiated procedure and there will be entered into a framework agreement with one provider. Coil tubing, fluid and nitrogen pumping, cf. Appendix 2 (doc. No 20/08783-1) and Appendix 2A (doc. No 20/08783-2): Pumping and coil tubing jobs, well consulting services and general engineering support. The service company shall review, prepare, and mobilise equipment, personnel, and services to perform the work as required for Gas Storage Denmark. The equipment and personnel provided shall be suitable to perform the activities necessary and usual for natural gas storage in standard 3 000 psi wells including: • coil tubing service — clean outs; — logging or perforating; — milling; — fishing; • pumping services — cementing; — nitrogen lifting; • handling and storage of fluids. Technical assistance on Gas Storage Denmark’s office duties: the service company shall when required provide onshore project management, well design.
Timeline
Publish date
4 years ago
Close date
4 years ago
Buyer information
Energinet Forretningsservice A/S
- Contact:
- Helle Barløse
- Email:
- procurement@energinet.dk
Explore contracts and tenders relating to Energinet Forretningsservice A/S
Go to buyer profileNotice topics
Source
Ted (OJEU)To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Openclosing
Market Dialogue on wellhead equipment, parts and services for Gas Storage Danmark
EnerginetPublished 17 days ago
- Closed
Advisory Services for Technical Evalution of Lille Torup Cavern Wells 2nd Opinion
EnerginetPublished 2 months ago
- Closed
Rådgivningsydelser på projektering af Fast Track Biogasprojektet
EnerginetPublished 6 months ago
- Closed
Rådgivningsydelser på projektering af Fast Track Biogasprojektet
EnerginetPublished 7 months ago
- Closed
Framework agreement - Advisory services - Scientific evaluations, engineering and supervision for underground gas
EnerginetPublished 8 months ago
- Unknown
Market Dialogue - Consultants to assist Gas Storage Denmark (GSD) in the rebuild of a natural gas storage salt cavern into an air storage cavern.
Energinet Gas Storage Denmark A/SPublished a year ago
Explore more suppliers to Energinet Forretningsservice A/S
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- Sport England
- Breckland District Council and South Holland District Council
- Devon Partnership NHS Trust
- NHS SOUTH WEST COMMISSIONING SUPPORT
- Medical Research Council
- North Cumbria Integrated Care NHS Foundation Trust
- Kilkenny and Carlow ETB
- South Tees Site Company Ltd
- BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
- Swale Academies Trust
- Orbital Marine Power
- Priory School
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.