£210,093,531
Published
Supplier(s)
Value
Description
HS2 Ltd has procured Switches and Crossing Contract across Phase One, Phase 2a, with an option exercisable to include those for Phase 2b of the project and the maintenance depots for the design, manufacture, delivery and provision of technical support for Switches and Crossings (S&C), including associated Points Operating Equipment (POE), together with Rail Expansion Devices (REDs). This includes installation of the condition monitoring system and POE. HS2 Ltd awarded three contracts to the same organisation as a result of this procurement: 1) A contract for the production of standard system designs, and 2) A single supplier framework agreement, and 3) A technical support contract for the provision of technical support services related to S&C's post installation. Further details describing the three contract types in detail are found in Section II.2.4) Description of the Procurement of this Notice. Lot 1: Procurement across Phase One, Phase 2a, with an option exercisable to include those for Phase 2b of the project and the maintenance depots for the design, manufacture, delivery and provision of technical support for Switches and Crossings (S&C), including associated Points Operating Equipment (POE), together with Rail Expansion Devices (REDs). This includes installation of the condition monitoring system and POE. Selection Criteria: The S&C system must include units that are proven in service. 1. S&C units designed, manufactured and delivered within the last 20 years which have a minimum of 2 years of use with commercial high-speed train services that meet all of the following criteria: - They are installed on Pre-Cast concrete slab track; - The 'diverging' path of the S&C layout uses a clothoidal switch entry geometry at the turnout beginning; and - They have a turn-out (diverging) speed of 200km/h or higher and a main line (through) speed of 300km/h or higher. where the term "commercial high-speed train services" refers to services operating on specially built high-speed lines equipped for speeds generally equal to or greater than 250 km/h. Phase One includes: - 469 single track km, including 250 bridges, 58 viaducts, 47 underbridges, 148 overbridges. - Three passing / maintenance loops/sidings and four complex track junctions. - 158 point ends, including 64 high-speed turnouts (between 130km/h and 230 km/h) and 72 low-medium speed turnouts (up to and including 100km/h) including 5 diamond crossovers and one set of trap points. - 54 REDs. - Option for S&C Calvert Infrastructure Maintenance Depot and additional S&C at Washwood Heath Rolling Stock Depot. Phase 2a includes: - 116 single track km, including 18 underbridges, 43 overbridges, 4 viaducts, 2 tunnels, 1 retained cutting. - 23 point ends, including 18 high-speed turnouts(between 130km/h and 230km/h) and 5 low-medium speed turnouts (up to and including 100km/h). - 23 Rail Expansion Devices (REDs). - Option for S&C at Stone Infrastructure Maintenance Base. The S&C contractual arrangements are as follows: - 1 Design Contract between HS2 as the Employer and the S&C Supplier as the Consultant for the initial standard design for S&C units: This Contract will commence in March 2023 with works commencing immediately with a planned duration of one year. 2. A Framework Agreement between HS2, the S&C Supplier, Track Contractors and the Washwood Heath Depot Contractor sets out the scope of the Framework Agreement and describes the obligations of the Parties (HS2 and the Supplier) regarding the calling-off of switches and crossings by the Purchaser and setting out the processes and mechanisms which allow S&C Scope to be ‘called-off’ for the detailed design, manufacture, supply, testing and commissioning of Switches and Crossings. This Contract will come into force in March 2023 and has an initial term of 12 years with an option for extension for up to two additional terms of 5 years each, at HS2’s sole discretion, if required. 3. Supply Call-Off Contracts between the S&C Supplier as Supplier and the Track Contractors, the Washwood Heath Depot Contractor or HS2 as Purchaser instigated following the Issue of a Call Off Notice and a Supply Call-Off Contract. The S&C Supplier will enter into Supply Call-Off Contracts with the Track Contractors and those Call-Off contracts will essentially form sub-contracts to the Track Contract. 4. A Technical Services Contract between HS2 as the Employer and the S&C Contractor as Contractor for the provision of technical support post-installation and during operations. This Contract initial term is 20-year period from an indicative start date of December 2029 with the option to extend further in 10-year durations up to a maximum cumulative total duration of 40 years. the schedule of rates agreed.
Timeline
Award date
2 years ago
Publish date
2 years ago
Buyer information
High Speed Two (HS2) Ltd
- Email:
- scc@hs2.org.uk
Explore contracts and tenders relating to High Speed Two (HS2) Ltd
Go to buyer profileNotice topics
Source
"Find-a-Tender"To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Awarded
G5-2E_HCC_008 Worthy Road Active Travel Improvements - Phase 1
Hampshire County Council637,370.82 GBPPublished 2 months ago
- Awarded
G5-1_HCC_043 Village Hall Crossing, Medstead
Hampshire County Council23,377.82 GBPPublished 2 months ago
- Awarded
G5-1_HCC_001 UDI Covers Remedial Works and additional works
Hampshire County Council62,780.88 GBPPublished 2 months ago
- Awarded
PLACE643- Non-contestable DNO work in Northern Power Grid network area
Derbyshire County Council50,000 GBPPublished 2 months ago
- Awarded
Framework Agreement For The Provision Of Thin Surfacing Schemes
Legal, Democratic and Business Intelligence, Swansea Council,Published 2 months ago
- Awarded
Domestic Gas Servicing, Repairs and Maintenance Contract
London Borough of Enfield7,000,000 GBPPublished 3 months ago
- Awarded
Roads and Infrastructure Maintenance and Improvement Services
North Lanarkshire Council450,000,000 GBPPublished 3 months ago
- Awarded
Roads and Infrastructure Maintenance and Improvement Services
North Lanarkshire Council450,000,000 GBPPublished 3 months ago
Explore other contracts published by High Speed Two (HS2) Ltd
Explore more open tenders, recent contract awards and upcoming contract expiries published by High Speed Two (HS2) Ltd.
- Awarded
Provision of Inbound Telephony Services
High Speed Two (HS2) Ltd40,000 GBPPublished 4 days ago
- Awarded
Noise and Vibration Expert Witness Services
High Speed Two (HS2) Ltd148,143 GBPPublished 7 days ago
- Awarded
Phase One Programme Assessment Support
High Speed Two (HS2) Ltd954,798 GBPPublished 8 days ago
- Awarded
NEC3 Licence and User Group Membership
High Speed Two (HS2) Ltd115,547.33 GBPPublished 21 days ago
- Awarded
Logistics Control Tower - VMBS and Inventory Management
High Speed Two (HS2) Ltd164,200 GBPPublished a month ago
Explore more suppliers to High Speed Two (HS2) Ltd
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.