Chesterfield Canal Trust - Main Works Contractor

98 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Value

2,900,000 GBP

Description

This Main Works package will restore around 350m of canal and associated works. In summary this will include the construction of canal channel, a lock, vehicle access bridge, the creation of Public Rights of Way (PROW) and the installation of a water supply pumping system. An overview of the works is listed below: Groundworks • Strip existing topsoil and stockpile • Installation of necessary temporary access roads and hardstanding areas to facilitate the proposed construction methodology • Implement agreed temporary protection measures to utilities • Excavation to formation levels • Testing of excavated materials as required by the remediation strategy • Stockpiling on site of suitable excavated material • Disposal off site of any materials deemed unsuitable • Installation of drainage • Placing excavated and imported materials to final profiles, including topsoil • Any other temporary works required to facilitate the proposed construction methodology, including the design of all such temporary works Canal • Construction of 350m of canal channel, including soft and hard edging • Install pumping system for water supply • Canal overflow Bellhouse Lane Bridge • Construction of new vehicular access bridge • Excavation to formation and construction of bridge foundations • Fabrication, delivery, assembly and installation of precast culvert • Formation of earth approach ramps • Road surfacing, vehicle restraint system and drainage to bridge • Surfacing and drainage to footpath approaches Lock • Construct new lock structure, including in-situ concrete, coping stones and brick facing • Manage installation of lock gates (via nominated supplier) Rights of Way • Constructing and / or maintaining temporary rights of way, including farm access • Construction, realignment or upgrade of 2.2km of footpaths • Removal of temporary footpaths and associated reinstatement • Installation only of new fingerboard signage for pedestrian routes Soft and Hard Landscaping Clay Relocation • Movement and placement of clay • Reworking of clay as per Earth Works Spec Report for clay liner CDM • Fulfilment of the Principal Contractor role as defined under CDM Regulations 2015 Site Visits A site familiarisation visit will be held WC 4 November 2024. Mid tender site visits will be held WC 25 November 2024.

Unlock decision maker contacts.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Orkney Islands Council

20,000,000 GBP

Published a month ago

Orkney Islands Council

20,000,000 GBP

Published a month ago

Norse Group Limited

200,000 GBP

Published 2 months ago

Ministry of Defence

Published 3 months ago

Gentoo Group Ltd

Published 3 months ago

National Highways Limited

Published 3 months ago

National Highways Limited

Published 3 months ago

Central and Cecil Housing Trust

90,000,000 GBP

Published 6 months ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.