Awarded contract
Published
H3AT - Water Detritiation System
76 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Description
The Supply of a WDS equipment package to be supplied at UKAEA’s Culham Campus. The scope of work is expected to be delivered, installed, and commissioned within an estimated duration of 36 months. The scope of the Assemblies includes final process, mechanical and EC&I design, procurement, fabrication, assembly, Factory Acceptance Testing, delivery, and installation at the Culham site, plus Site Acceptance Testing and Integrated Testing. Design – A process design has been produced for the Water Detritiation System and the proposed equipment has been separated into 10 Assemblies as manageable deliverables. The 10 Assemblies consist of process equipment mostly installed within gloveboxes, and one air extracted cabinet. Manufacturing, FAT, Delivery, Installation, SAT, Integrated Testing & Commissioning - The 10 Assemblies require manufacture, assembly within containments and installation. Lot 1: The Supply of a WDS equipment package to be supplied into the Hydrogen-3 Advanced Technology Facility at UKAEA’s Culham Campus. The scope of work is expected to be delivered, installed, and commissioned within an estimated duration of 36 months. The scope of the Assemblies includes final process, mechanical and EC&I design, procurement, fabrication, assembly, Factory Acceptance Testing, delivery, and installation at the Culham site, plus Site Acceptance Testing and Integrated Testing. Design – A process design has been produced for the Water Detritiation System and the proposed equipment has been separated into 10 Assemblies as manageable deliverables. The 10 Assemblies consist of process equipment mostly installed within gloveboxes, and one air extracted cabinet. Manufacturing, FAT, Delivery, Installation, SAT, Integrated Testing & Commissioning - The 10 Assemblies require manufacture, assembly within containments and installation. This includes (but not limited to): installation of the equipment; agreeing and identifying tie-points for process service and electrical distribution interfaces; agreeing and identifying other process interfaces. The Contractor must undertake Factory Acceptance Testing. The commissioning of the fully integrated subsystems shall be carried out by the UKAEA Operations team with support from the Systems Integrator and The Contractor. During inactive commissioning all operations will be tested, and the plant performance assessed under a wide range of expected operating conditions. The Contractor shall provide, People Rates for assisting with commissioning.
Personalised AI Summary
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
National Nuclear Laboratory Ltd
–
Published 3 days ago
United Kingdom Atomic Energy Authority
–
Published 3 days ago
Awarded
Pen-ffordd-goch / Keepers Pond - Matters in the Interest of Safety under the Reservoirs Act 1975 Geo
Bannau Brycheiniog National Park Authority
–
Published 4 days ago
City and County of Swansea
–
Published 6 days ago
High Speed Two (HS2) Ltd
75,000 GBP
Published 7 days ago
High Speed Two (HS2) Ltd
75,000 GBP
Published 7 days ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.