NWRT - SAF-AS0522-P2 Fencing, hedgerow planting
Published
Description
Summary or works Supply and install ~1050m of stock fencing Supply and install ~500m of double hedgerow Supply and install 6 x 12’ galvanised steel gates Supply and install 6 x 400 gallon concrete troughs with hard standing Dig to ploughing depth and lay ~1000m of 32mm water pipe to feed all troughs. Supply and install 1 x 10,000l header tank which will store water and feed the troughs via gravity system. Work specifications ~1050m of stock fencing of fields along banks of the Afon Bach tributary, see map for details. Fence to be constructed using FSC certified, UC4 treated timber and high tensile wire. Strainer posts (~ 19) to be 7-8” diameter and at start, end and major changes in direction, supported by braced struts. Turning posts 5-6” (~ 13) used at minor changes in direction or height. Intermediate posts 3-4” diameter and no more than 11’ apart. 80 cm sheep netting with two strands of barbed wire, one above and one below the netting. Strainer posts and struts to be no closer than 2 m from the top of a steep bank, or if gentle sloped bank no closer than 2 m to the water’s edge. The exact positioning of the fence will be agreed between the contractor, landowner, and NWRT before installation. The finished fence height should be approximately 1.1m (44”). Use of a track machine is obligatory due to wet ground conditions likely to be encountered at this farm. Supply and install ~500m of double row hedgerow planting along the contour of the tributary (see maps attached). This is to be planted before the fencing. Typical species mix to include but not limited to: Blackthorn, hawthorn, gorse, hazel and dog rose. All planting must be in-keeping with current native species present in the area. No hedgerow planting at gate sites. Supply and hang 6 x 12’ galvanised steel access gates at locations in plan including self-closing springs with appropriate tie-back stakes/latches. Access gates should always be hung on gate posts which are railed to a strainer, never hung on the same post that wire is tensioned to. - Supply and install 6 x 400-gallon concrete drinking troughs with hard standing areas at locations shown in the site plan. All troughs need to be suitable for sheep and cattle. Supply and install 1 x 10,000l header tank. Construct a 32mm instream intake pipe 10m higher elevation than the header tank. This intake pipe will require a sufficient filter head to prevent debris/sediment entering the system. The intake pipe is to be placed in a suitably deep and sediment free pool. Piping – Dig trench for ~1000m of water supply pipe to ploughing depth. Pipe from watercourse abstraction point is to be one unbroken piece (no joints) of 25mm pipe (a 5m pipe is supplied, but if solar pump is placed further away from the watercourse, another suitable pipe will need sourcing). Piping from the water pump going to the troughs is to be 32mm ONLY with fast flow/low pressure ball valves on water troughs so water flow rate is not restricted. ANY joints fitted are to be suitable Plasson joints. As work will be completed out of the in-river season, no embedded abstraction point can be installed. However, it is also not worth embedding the abstraction pipe into the bank given the size of this tributary. A suitably deep pool will suffice for the abstraction pipe where it can be secured in the river bed and fed via gravity to the header tank which will supply water to all troughs at lower elevations ACCESS to site: (Make sure you have checked permissions for all access to the site not just the landowner i.e. if access crosses over different farmers fields). Give exact instructions on how to get to the site and how to enter. Is there a specified area to leave goods i.e. gravels? Is there hard terrain or bog? Is it suitable for all types of vehicles? All measurements are indicative, and quoted totals will be taken as definitive. It is the contractor’s obligation to clarify measurements to their own satisfaction, as adjustment to
Timeline
Publish date
10 months ago
Close date
10 months ago
Buyer information
North Wales River Trust
- Contact:
- Liam Whitmore
- Email:
- liam@northwalesriverstrust.org
Explore contracts and tenders relating to North Wales River Trust
Go to buyer profileNotice topic
Source
Sell2WalesTo save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Openclosing
ERCF2325.8 Storm Babet - Mostyn Rd Llansannan
Conwy County Borough CouncilPublished 10 days ago
- Openclosing
WAS-ITT-57869 - Newport Ambulance Station Fencing Works
NHS Wales - Shared Services PartnershipPublished 13 days ago
- Openclosing
Replace 1020m of Fencing at Lindsayfield, East Kilbride
Cairn Housing AssociationPublished 27 days ago
- Openclosing
Framework Agreement for the Supply of Facilities Management Equipment, Fencing, Floor Cleaning Machines, White Goods and Commercial Laundry Equipment
Hampshire County Council3,500,000 GBPPublished 28 days ago
- Openclosing
Framework for the supply of Facilities Management Equipment, Fencing, Floor Cleaning Machines, White Goods and Commercial Laundry Equipment
Hampshire County Council4,000,000 GBPPublished 28 days ago
- Openclosing
CBC-1739-T-TS External adaptation works to housing properties
Central Bedfordshire CouncilPublished a month ago
Explore other contracts published by North Wales River Trust
Explore more open tenders, recent contract awards and upcoming contract expiries published by North Wales River Trust.
- Closed
NWRT - Nant Garred Ddu Rocky Ramp NGarrDdu-Rramp-0001
North Wales River TrustPublished 5 months ago
- Closed
NWRT - SWIMWAYS_P01, fencing, tree planting, gates, troughs
North Wales River TrustPublished 10 months ago
- Closed
NWRT - SWIMWAYS_P02, fencing, tree planting, gates, troughs, solar
North Wales River TrustPublished 10 months ago
Explore more suppliers to North Wales River Trust
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- Royal Berkshire Fire Authority
- Health and Social Care Information Centre
- BABCOCK INTERNATIONAL GROUP PLC
- Bath and Northeast Somerset, Swindon and Wiltshire STP
- Tayside Procurement Consortium
- Orchard Hill College and Academy Trust
- Hayes School (Bromley)
- Broadcasting Authority of Ireland
- Spend Network
- North East London Foundation Trust and Barnet Enfield and Haringey NHS Trust
- Hope Learning Trust
- Shears Green Infant School
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.