Highways England has procured a Pavement Framework for the supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing (milling), paving, ironwork and associated ancillary works, adjustment, renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The framework has been designed and shaped in line with the collaborative approach set out in the Highways England Supply Chain Strategy to enable better end to end focus on performance specifically around safety, customer and efficiency. Investment in pavements over the Roads Investment Strategy period 2015-2020 is circa 3 300 000 000 GBP and it is expected that 2 300 000 000 GBP of the pavements programme will be procured via this Framework, indicative lot values have been provided based on 2 300 000 000 GBP. Highways England has stated 3 300 000 000 GBP to allow for additional programme investment from Highways England or other Contracting Authorities. Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 12 Yorkshire, Lincolnshire, Derbyshire. Location to include A1M - M1, M18, M62, M180, M181, M606, M621, A1, A19, A57, A61, A63, A64, A160, A168, A180, A616, A628, A1033 and A631 lower deck of Tinsley viaduct at M1 junction 34. Area 14 Durham, Northumberland, North Yorkshire, Tyne and Wear. Location to include A1(M)/A1, A19, A184, A194(M), A66(M)/A66, A1033 and the A696. The anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 and 7 North East, Lot 2 and 8 East, Lot 3 and 9 South East, Lot 4 & 10 South West, Lot 5 and 11 Midlands and Lot 6 and 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 1 to 6: Suppliers appointed to Lot 1 to 6 will provide pavement works on projects where pavement element is estimated at over 1 000 000 GBP. Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 6 Cambridgeshire, Essex, Norfolk, Suffolk. Location to include M11 junction 6 to 9. A1 between A1(M) and Stamford at A43. M11 from Junction 9 to Junction with A11/A1301/B181 (where motorway ends) at Stumps Cross. A11 between A14 and A47. A12(S) between M25 junction 28 and Ipswich. A12(N) between Great Yarmouth and Lowestoft. A14 between A142/Exning junction (junction 37) and Felixstowe. A47 between Peterborough and Great Yarmouth. A120(W) Stansted (M11) to Marks Tey (A12). A120(E) Colchester to Harwich. Area 8 Bedfordshire, Buckinghamshire, Cambridgeshire, Hertfordshire, Essex. Location to include M1 from junction 6A, St Albans, Hertfordshire to Milton Keynes/Northamptonshire border north of junction 14, including junction 10 to 10a, Luton. M11 from junction 9, Stump Cross, Essex to Junction 14, Girton Interchange, Cambridgeshire. A14 from the A45 to Newmarket A1(M) Junction 6 to Junction 10. A1(M) from junction 6, Welwyn, Hertfordshire to junction 10, Radwell, Bedfordshire. A14 from Thrapston (junction 13), Northamptonshire to A14 Newmarket (junction 37), Suffolk including a 2 mile spur between Alconbury and Huntingdon. A11 from M11 junction 9, Stumps Cross, to A14 Newmarket (junction 36). A1 from A1(M) junction 10 to A1(M) junction 14 Alconbury. A421 from M1 junction 13, Bedfordshire to A1 Black Cat Roundabout, Roxton, Bedfordshire. A428 from the A1 Wyboston Interchange, Bedfordshire to A14/M11 junction 14 Girton Interchange, Cambridgeshire. A5 from M1 junction 9, Flamstead, Hertfordshire to A508 Old Stratford roundabout, Milton Keynes. A414 from the M1 junction 8 to A405 at St. Albans to A5183 junction. The anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 & 7 North East, Lot 2 & 8 East, Lot 3 & 9 South East, Lot 4 & 10 South West, Lot 5 & 11 Midlands and Lot 6 & 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 1 to 6: Suppliers appointed to Lots 1 to 6 will provide pavement works on projects where pavement element is estimated at over £1m. Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 3 Berkshire, Buckinghamshire, Dorset, Hampshire, Surrey, Oxfordshire. Location to include M27, M271 (Total length). M275 (From A27/M27 to Tipner Lane Bridge). A27 (A27 from Hilsea to the A259 Warblington). A31 (From Bere Regis to J1 M27 Cadnam). M3 (From J2 Thorpe to J14 Chilworth). A3, A3 (M) (From Ockham to Horndean). A303 (From M3 J8 to A338 Parkhouse Cross). M4 (From J5 Slough to J15 Swindon). A404 (From A404(M) J9b to M40 Handy Cross). A404(M) (Total length). A34 (From M3 J9 to M40 J9 Wendlebury). A308M (Total length). M25 at Ockham I/C (Surrey) South to its junction with the A3(M). Area 4 Kent, Surrey, East Sussex, West Sussex. Location to include M23 from M25 junction. A23 Sussex. A27 East and West Sussex. A26. A259. A21 Sussex and Kent from M25 junction. M20. M2. A2. A20. A249. A2070. A259. M25 and A282 at Dartford and start M2 Junction 1 M23 between A25 overbridge and M23 Junction 11. The anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 & 7 North East, Lot 2 & 8 East, Lot 3 & 9 South East, Lot 4 & 10 South West, Lot 5 & 11 Midlands and Lot 6 & 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 1 to 6: Suppliers appointed to Lots 1 to 6 will provide pavement works on projects where pavement element is estimated at over £1m. Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 1 Cornwall, Devon. Location to include A30 and the A38 all-purpose trunk roads to the west of M5 junction 31 and the A30 from the M5 junction 29 to the eastern end of the Honiton bypass and the A35 Honiton to Bere Regis. Area 2 Bristol, Devon, Dorset, Gloucestershire, Somerset, Wiltshire. Location to include M4 (junction 15 to Second Severn Crossing). M5 (junction 9 to 31). M32 (M4 junction 19 to 3). M48 (M4 junction 21 to J2). M49 (M5 junction 18a to M4 junction 22). A30/A303 (Honiton to Wilts/Hants boundary near A338 junction). A4 Avonmouth Relief Road. A4 from London Road roundabout to junction of A363 (Bathford east of Bath). A36 (Bath at Bathampton to M27 junction 2). A40 from M5 junction 11 Westwards to Gloucestershire and Hereford-shire boundary near Ross on Wye. A46 (M4 junction 18 to A4 east of Bath). A417-M5 Junction 11A (start of Brockworth Bypass) to the junction of the A40 and A38 Zoons Court Roundabout. The anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 & 7 North East, Lot 2 & 8 East, Lot 3 & 9 South East, Lot 4 & 10 South West, Lot 5 & 11 Midlands and Lot 6 & 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 1 to 6: Suppliers appointed to Lots 1 to 6 will provide pavement works on projects where pavement element is estimated at over £1m, Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 7 - Derbyshire, Leicestershire, Rutland, Lincolnshire, Nottinghamshire, Northamptonshire. Location to include M1 from junction 30 to south of junction 15. M6 junction 1 to M1 junction 19. M45. M69 between junction 1 and M1 Junction 21. A1 Blyth in Nottinghamshire to Stamford in Lincolnshire A5 between Atherstone and Old Stratford, Milton Keynes. A6 Alvaston bypass A14 between Thrapston and the M1 junction 19. A38 between Burnaston and the M1 junction 28. A42 from the M1 to the M42. A43 between the M40 junction 10 and M1 junction 15a. A45 between Thrapston and the M1 junction 15. A46 between Lincoln and M1 junction 21a. A50 junction 1 to M1 junction 24A - Please see the A50/A564 Stoke to Derby Link scheme page for more information. A52 between the A1 at Barrowby and Spondon, Derby. A453 between Nottingham and M1 junction 23A. A5111 from the A52 at Spondon to the A6 Alvaston bypass. A516 to A38. A50 from Junction 1 to M1 Junction 24. Area 9 - Gloucestershire, Shropshire, Staffordshire, Warwickshire, West Midlands, Worcester, Herefordshire. A40 Herefordshire. A49 Herefordshire and Shropshire. A5 Warwickshire to Shrewsbury. A458 Shrewsbury. A483 Shrewsbury. M54 junction 1 to 7. M50 junction 4 to 8. M5 junction 1 to 9. M6 junction 1 to 16. A46 (from M5 junction 9 to M6 junction 2). M40 junction 13 to M42 junction 3A. A500 Staffordshire. A38 Staffordshire. A45 Rugby to Coventry. M69 (from A46 Walsgrave on Sowe to A5 Hinckley). A50 DBFO. M6 Toll. A449T between M50 junction 4 and A40; A40T between A449T and Welsh Border (290m West); A46 between M5 junction 9 and M40 junction 15; M5 between junction 9 and M6 junction 8; M42 between M5 junction 4A to junction 11 (A42); M40 between M42 junction 3A to junction 15; M6 between junctions 1 and 16. A458 between A5 (Churncote) and Welsh Border (Middletown); A483 between A5 (Mile End) and Welsh Border (Llanymynech); A49 between A5 (Shrewsbury) and A40 (Ross-on-Wye); A45 between M42 junction 6 and A452 (Stonebridge Island); A45 between A46 (Festival Island) and the M45; A46 between M6 junction 2 and M40 junction 15; A446 from Stonebridge island to M6 J4; A5 between A449 Gailey to B4111 (Mancetter Island); A449 between N54 junction 2 to A5 Gailey; A4123 between A4034/A4123 island and M5 J2; M69 between junction 1 and M6 junction 2; A50 between A521 (including Meir Interchange and Meir Tunnel) to A500; A500 between 15 and 16; A5148 between A5 Wall island and A38 Swinfen island; A4097 between Dunton Island M6 Toll slip road. A38M slip roads at M6 J6; A423 from A45 to Peugeot Talbot Island; A5127 slips roads at M6 J6. TThe anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 & 7 North East, Lot 2 & 8 East, Lot 3 & 9 South East, Lot 4 & 10 South West, Lot 5 & 11 Midlands and Lot 6 & 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 1 to 6: Suppliers appointed to Lots 1 to 6 will provide pavement works on projects where pavement element is estimated at over £1m. Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 10 Cheshire, Merseyside, Greater Manchester, Lancashire. Location to include M6 (junction 15 to just north of junction 30). M53. M56. M57. M58. M60. M61. M62 (A5058 to junction 23). M66. M67. M602. A55 (junction 36A to M53 junction 12). A56 (M66 to M65). A483 (Welsh border to A55). A494 (A550 to M56). A550 (Welsh border to M53 junction 5). A556 (M6 junction 19 to M56 junction 7). A627(M), A663 (A627(M) to A6104) and A5036 (A565 to M57). Area 13 Cumbria, Lancashire. Location to include A74 - M6, M55, A66, A69, A74(M), A585, A590, A595. The anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 & 7 North East, Lot 2 & 8 East, Lot 3 & 9 South East, Lot 4 & 10 South West, Lot 5 & 11 Midlands and Lot 6 & 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 1 to 6: Suppliers appointed to Lots 1 to 6 will provide pavement works on projects where pavement element is estimated at over £1m. Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 12 Yorkshire, Lincolnshire, Derbyshire. Location to include A1M - M1, M18, M62, M180, M181, M606, M621, A1, A19, A57, A61, A63, A64, A160, A168, A180, A616, A628, A1033. Area 14 Durham, Northumberland, North Yorkshire, Tyne and Wear. Location to include A1(M)/A1, A19, A184, A194(M), A66(M)/A66, A1033 and the A696. The anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 & 7 North East, Lot 2 & 8 East, Lot 3 & 9 South East, Lot 4 & 10 South West, Lot 5 & 11 Midlands and Lot 6 & 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 7 to 12: Suppliers appointed to Lots 7 to 12 will provide pavement works on projects where pavement element is estimated at under £1m, example regional maintenance (not limited to regional maintenance). Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 6 Cambridgeshire, Essex, Norfolk, Suffolk. Location to include M11 junction 6 to 9. A1 between A1(M) and Stamford at A43. M11 from Junction 9 to Junction with A11/A1301/B184 (where motorway ends) at Stumps Cross. A11 between A14 and A47. A12(S) between M25 junction 28 and Ipswich. A12(N) between Great Yarmouth and Lowestoft. A14 between A142/Exning junction (junction 37) and Felixstowe. A47 between Peterborough and Great Yarmouth. A120(W) Stansted (M11) to Marks Tey (A12). A120(E) Colchester to Harwich. Area 8 Bedfordshire, Buckinghamshire, Cambridgeshire, Hertfordshire, Essex. Location to include M1 from junction 6A, St Albans, Hertfordshire to Milton Keynes/Northamptonshire border north of junction 14, including junction 10 to 10a, Luton. M11 from junction 9, Stump Cross, Essex to Junction 14, Girton Interchange, Cambridgeshire. A1(M) from junction 6, Welwyn, Hertfordshire to junction 10, Radwell, Bedfordshire. A14 from the A45 to Newmarket A1(M) Junction 6 to Junction 10. A14 from Thrapston (junction 13), Northamptonshire to A14 Newmarket (junction 37), Suffolk including a 2 mile spur between Alconbury and Huntingdon. A11 from M11 junction 9, Stumps Cross, to A14 Newmarket (junction 36). A1 from A1(M) junction 10 to A1(M) junction 14 Alconbury. A421 from M1 junction 13, Bedfordshire to A1 Black Cat Roundabout, Roxton, Bedfordshire. A428 from the A1 Wyboston Interchange, Bedfordshire to A14/M11 junction 14 Girton Interchange, Cambridgeshire. A5 from M1 junction 9, Flamstead, Hertfordshire to A508 Old Stratford roundabout, Milton Keynes. A414 from the M1 junction 8 to A405 at St. Albans. The anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 & 7 North East, Lot 2 & 8 East, Lot 3 & 9 South East, Lot 4 & 10 South West, Lot 5 & 11 Midlands and Lot 6 & 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 7 to 12: Suppliers appointed to Lots 7 to 12 will provide pavement works on projects where pavement element is estimated at under £1m, example regional maintenance (not limited to regional maintenance). Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 3 Berkshire, Buckinghamshire, Dorset, Hampshire, Surrey, Oxfordshire. Location to include M27, M271 (Total length). M275 (From A27/M27 to Tipner Lane Bridge). A27 (A27 from Hilsea to the A259 Warblington). A31 (From Bere Regis to J1 M27 Cadnam). M3 (From J2 Thorpe to J14 Chilworth). A3, A3 (M) (From Ockham to Horndean). A303 (From M3 J8 to A338 Parkhouse Cross). M4 (From J5 Slough to J15 Swindon). A404 (From A404(M) J9b to M40 Handy Cross). A404(M) (Total length). A34 (From M3 J9 to M40 J9 Wendlebury). A308M (Total length). M25 at Ockham I/C (Surrey) South to its junction with the A3 (M). Area 4 Kent, Surrey, East Sussex, West Sussex. Location to include M23 from M25 junction. A23 Sussex. A27 East and West Sussex. A26. A259. A21 Sussex and Kent from M25 junction. M20. M2. A2. A20. A249. A2070. A259. M25 and A282 at Dartford and start M2 Junction 1 M23 between A25 overbridge and M23 Junction 11. The anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 & 7 North East, Lot 2 & 8 East, Lot 3 & 9 South East, Lot 4 & 10 South West, Lot 5 & 11 Midlands and Lot 6 & 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 7 to 12: Suppliers appointed to Lots 7 to 12 will provide pavement works on projects where pavement element is estimated at under £1m, example regional maintenance (not limited to regional maintenance). Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 1 Cornwall, Devon. Location to include A30 and the A38 all-purpose trunk roads to the west of M5 junction 31 and the A30 from the M5 junction 29 to the eastern end of the Honiton bypass and the A35 Honiton to Bere Regis. Area 2 Bristol, Devon, Dorset, Gloucestershire, Somerset, Wiltshire. Location to include M4 (junction 15 to Second Severn Crossing). M5 (junction 9 to 31). M32 (M4 junction 19 to 3). M48 (M4 junction 21 to J2). M49 (M5 junction 18a to M4 junction 22). A30/A303 (Honiton to Wilts/Hants boundary near A338 junction). A4 Avonmouth Relief Road. A4 from London Road roundabout to junction of A363 (Bathford east of Bath). A36 (Bath at Bathampton to M27 junction 2). A40 from M5 junction 11 Westwards to Gloucestershire and Hereford-shire boundary near Ross on Wye. A46 (M4 junction 18 to A4 east of Bath). A417-M5 Junction 11A (start of Brockworth Bypass) to the junction of the A40 and A38 Zoons Court Roundabout. The anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 & 7 North East, Lot 2 & 8 East, Lot 3 & 9 South East, Lot 4 & 10 South West, Lot 5 & 11 Midlands and Lot 6 & 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 7 to 12: Suppliers appointed to Lots 7 to 12 will provide pavement works on projects where pavement element is estimated at under £1m, example regional maintenance (not limited to regional maintenance). Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 7 - Derbyshire, Leicestershire, Rutland, Lincolnshire, Nottinghamshire, Northamptonshire. Location to include M1 from junction 30 to south of junction 15. M6 junction 1 to M1 junction 19. M45. M69 between junction 1 and M1 Junction 21. A1 Blyth in Nottinghamshire to Stamford in Lincolnshire A5 between Atherstone and Old Stratford, Milton Keynes. A6 Alvaston bypass A14 between Thrapston and the M1 junction 19. A38 between Burnaston and the M1 junction 28. A42 from the M1 to the M42. A43 between the M40 junction 10 and M1 junction 15a. A45 between Thrapston and the M1 junction 15. A46 between Lincoln and M1 junction 21a. A50 junction 1 to M1 junction 24A - Please see the A50/A564 Stoke to Derby Link scheme page for more information. A52 between the A1 at Barrowby and Spondon, Derby. A453 between Nottingham and M1 junction 23A. A5111 from the A52 at Spondon to the A6 Alvaston bypass. A516 to A38. A50 from Junction 1 to M1 Junction 24. Area 9 - Gloucestershire, Shropshire, Staffordshire, Warwickshire, West Midlands, Worcester, Herefordshire. A40 Herefordshire. A49 Herefordshire and Shropshire. A5 Warwickshire to Shrewsbury. A458 Shrewsbury. A483 Shrewsbury. M54 junction 1 to 7. M50 junction 4 to 8. M5 junction 1 to 9. M6 junction 1 to 16. A46 (from M5 junction 9 to M6 junction 2). M40 junction 13 to M42 junction 3A. A500 Staffordshire. A38 Staffordshire. A45 Rugby to Coventry. M69 (from A46 Walsgrave on Sowe to A5 Hinckley). A50 DBFO. M6 Toll. A449T between M50 junction 4 and A40; A40T between A449T and Welsh Border (290m West); A46 between M5 junction 9 and M40 junction 15; M5 between junction 9 and M6 junction 8; M42 between M5 junction 4A to junction 11 (A42); M40 between M42 junction 3A to junction 15; M6 between junctions 1 and 16. A458 between A5 (Churncote) and Welsh Border (Middletown); A483 between A5 (Mile End) and Welsh Border (Llanymynech); A49 between A5 (Shrewsbury) and A40 (Ross-on-Wye); A45 between M42 junction 6 and A452 (Stonebridge Island); A45 between A46 (Festival Island) and the M45; A46 between M6 junction 2 and M40 junction 15; A446 from Stonebridge island to M6 J4; A5 between A449 Gailey to B4111 (Mancetter Island); A449 between N54 junction 2 to A5 Gailey; A4123 between A4034/A4123 island and M5 J2; M69 between junction 1 and M6 junction 2; A50 between A521 (including Meir Interchange and Meir Tunnel) to A500; A500 between 15 and 16; A5148 between A5 Wall island and A38 Swinfen island; A4097 between Dunton Island M6 Toll slip road. A38M slip roads at M6 J6; A423 from A45 to Peugeot Talbot Island; A5127 slips roads at M6 J6. The anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 & 7 North East, Lot 2 & 8 East, Lot 3 & 9 South East, Lot 4 & 10 South West, Lot 5 & 11 Midlands and Lot 6 & 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 7 to 12: Suppliers appointed to Lots 7 to 12 will provide pavement works on projects where pavement element is estimated at under £1m, example regional maintenance (not limited to regional maintenance). Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 10 Cheshire, Merseyside, Greater Manchester, Lancashire. Location to include M6 (junction 15 to just north of junction 30). M53. M56. M57. M58. M60. M61. M62 (A5058 to junction 23). M66. M67. M602. A55 (junction 36A to M53 junction 12). A56 (M66 to M65). A483 (Welsh border to A55). A494 (A550 to M56). A550 (Welsh border to M53 junction 5). A556 (M6 junction 19 to M56 junction 7). A627(M), A663 (A627(M) to A6104) and A5036 (A565 to M57). Area 13 Cumbria, Lancashire. Location to include A74 - M6, M55, A66, A69, A74(M), A585, A590, A595. The anticipated contract length will be 4 years and will be divided into Regional Lots, Lot 1 & 7 North East, Lot 2 & 8 East, Lot 3 & 9 South East, Lot 4 & 10 South West, Lot 5 & 11 Midlands and Lot 6 & 12 North West. Each of the 6 Regions will include x 2 sub Lots. 12 totalled. Lots 7 to 12: Suppliers appointed to Lots 7 to 12 will provide pavement works on projects where pavement element is estimated at under £1m, example regional maintenance (not limited to regional maintenance).
Timeline
Award date
7 years ago
Publish date
7 years ago
Buyer information
National Highways Limited
- Email:
- PavementMaterialsFramework@highwaysengland.co.uk
Explore contracts and tenders relating to National Highways Limited
Go to buyer profileNotice topics
Source
Ted (OJEU)Tender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Awarded
Mould Eradication Works
Rotherham Metropolitan Borough Council
4,115,000 GBP
Published a day ago
- Awarded
Port Ellen Terminal Development SXL0820 Mini Comp - Commercial Cost Advisor & NEC4 Project Manager
Caledonian Maritime Assets Ltd (Utility)
498,225 GBP
Published 2 days ago
- Awarded
Housing 21 - Responsive Repair and Maintenance Works
Housing 21
2,100,000 GBP
Published 2 days ago
- Awarded
B9082 Gutcher to Cullivoe Road Improvement Scheme, Yell, Shetland
Shetland Islands Council
Published 2 days ago
- Awarded
Development of a Package Deal for the provision of affordable housing in Pembroke Dock
Pembrokeshire County Council
10,053,740 GBP
Published 2 days ago
- Awarded
PDF - 617089 A303 Andover Bypass
National Highways Limited
2,214,116.99 GBP
Published 2 days ago
Explore other contracts published by National Highways Limited
Explore more open tenders, recent contract awards and upcoming contract expiries published by National Highways Limited.
- Awarded
HRE - CLOSED BRANCH LINES MINOR WORKS - KLM/61 - INVASIVE SPECIES TREATMENT
National Highways Limited
17,756 GBP
Published 2 days ago
- Awarded
Dartford & Hindhead HATMS Tunnel Systems (Swarco)
National Highways Limited
923,374.8 GBP
Published 2 days ago
- Awarded
Dartford & Hindhead HATMS Tunnel Systems (Cubic)
National Highways Limited
3,974,382 GBP
Published 2 days ago
- Awarded
PDF - 617089 A303 Andover Bypass
National Highways Limited
2,214,116.99 GBP
Published 2 days ago
- Awarded
HRE - CLOSED BRANCH LINES MINOR WORKS - DLR/63 - REPAIRS IDENTIFIED IN DETAILED EXAMINATION DATED 16.11.21
National Highways Limited
87,291 GBP
Published 3 days ago
- Awarded
CLOSED BRANCH LINES MINOR WORKS - PTP/12M3CH, BRIDLEWAY AT BRITHDIR - VEGETATION REMOVAL, REPAIRS & REPLACE PAINT SYSTEM
National Highways Limited
240,072.65 GBP
Published 3 days ago
- Awarded
HRE - Shropshire & Montgomeryshire - Llwyntidmon Hall overbridge - SAM/42
National Highways Limited
48,777.91 GBP
Published 3 days ago
- Awarded
CLOSED BRANCH LINES MINOR WORKS - BMZ/6, GLYN OGWR OVERBRIDGE - VEGETATION REMOVAL, REPAIRS & REPLACE PAINT SYSTEM
National Highways Limited
226,267.97 GBP
Published 3 days ago
- Awarded
HRE - SAD/81 - BATH ROAD VIADUCT - REMOVAL AND REPLACEMENT OF PADLOCKS
National Highways Limited
392 GBP
Published 3 days ago
Explore more suppliers to National Highways Limited
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.