150 MW Electrical Boilers at Norbis Park

13 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Value

37,919,700 DKK

Current supplier

Inopower A/S

Description

This procurement procedure concerns the award of a contract regarding delivery and installation of a 150 MW Electrical Boiler Plant and distribution manifold used for District Heating. The procurement procedure is carried out as a negotiated procedure with prior call for competition according to section 47 of the Utility Directive (2014/25/EU). See section 3.5 in the Tender Conditions for additional information about how negotiations will be conducted. Lot 1: Aalborg Forsyning is planning to phase out coal and all other fossil fuel consuming units by the end of year 2028, by implementing a variety of different new heat producing units. A key element for this transition is to install a 150 MW Electrical Boiler Plant as contingency and peak load Heat production including temperature boosting of other heat producing units with a low discharge temperature (e.g., temperature boosting from 75 to 90 °C). This procurement procedure therefore concerns the award of a Contract regarding delivery and installation of a 150 MW Electrical Boiler Plant and manifold. The scope of work includes complete engineering, delivery, erection, commissioning, and documentation of a 150 MW Electrical Boiler Plant for production of District Heating water with a maximum discharge temperature of 98 °C. The contractor’s work shall include all measures and secondary services that are necessary for the full completion of the boiler plant. The boiler plant must be designed as 3 x 50 MW boiler units. Main components of the scope of work includes: • 3 pieces complete boiler units including internal and external pipe circuits with pumps, valves, instrumentation etc. • 2 pieces common District Heating manifolds (return/flow) that connect the boilers to the external District Heating grid and possible luke warm District Heating producers. • All necessary auxiliary equipment, such as chemical dosing and Nitrogen supply. • All necessary stairs and platforms for access for service and maintenance. Please see the General Description and the Technical Description for a more detailed description of the Scope of work. Please see the Tender Conditions, the Construction Contract and Aalborg Forsyning’s adjusted version of NLM 19E with deviations and additions for more information regarding the commercial terms and conditions.

Unlock decision maker contacts.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Fødevarestyrelsen

Published 14 days ago

Banedanmark

Published a month ago

Greve Kommune

Published a month ago

Lyngby-Taarbæk Vand A/S

Published 2 months ago

Danmarks Tekniske Universitet - DTU

Published 2 months ago

Klima-, Energi- og Forsyningsministeriet

Published 3 months ago

Klima-, Energi- og Forsyningsministeriet

Published 3 months ago

Klima-, Energi- og Forsyningsministeriet

Published 3 months ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.