Stotles logo

Awarded contract

Published

Supply of One New Towage Boat (Design and Build)

30 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Value

7,500,000 GBP

Close date

2022-07-04

Description

Orkney Islands Council, as Statutory Harbour Authority (the “Authority”) has a requirement for the supply of one design and build tug boat which meets the Council’s specification, which are required to provide a safe and reliable towage service in the Scapa Flow (including Flotta Oil Terminal) and Kirkwall harbour areas. Lot 1: Supply of One New Tug Boat (Design and Build) - Currently Under Construction The Basic Specification is given as a guide as to the specific requirements of the Owner. 1.1. The principal dimensions of the vessel are expected to be approximately as follows:- Length overall : +/- 32 metres Breadth extreme : 12 to 14 metres Operating draft : MAXIMUM of 5.50 metres (navigational draft), when fully loaded with fuel and FW 1.2. The vessel is to be constructed, equipped and outfitted in accordance with the latest Rules and Regulations of Lloyd’s Register or other IACS member society, for Unrestricted Service. 1.3. The vessel is to be constructed under survey of Lloyd’s Register or other IACS member society, and delivered in Class. As a minimum, Class Notations assigned should be the following (or equivalent according to the Classification Society):- +100A1 Escort Tug UMS +LMC Firefighting 1 with water spray *IWS 1.4. The Gross Tonnage should be less than 500. 1.5. The design, construction and fitout of the vessel is to be in compliance with all statutory international regulations and MCA requirements for a vessel of UK Class IX. 1.6. Crew accommodation to be provided in 6 single cabins, two of which to also have folding or pull-out bunks for occasional use. Lifesaving appliances to be provided for 16 persons, 1.7. Vessel to be delivered UK flagged. Contractors to arrange for MCA inspection, in order to issue ‘Record of Inspection of Safety Equipment’ (MSF1102). 1.8. The vessel’s stability and freeboard should be suitable to permit carrying one 20- foot container on the main deck, of gross weight up to 10 tonnes, whilst the vessel is fully loaded with fuel and fresh water. The provision (design and build contract) of one new build tug to meet the Council’s specification, Lot 1 will be for a new build tug that is currently under construction with a Contract duration and delivery timescale following successful sea trials, of within 6 months. The Authority already operates tug vessels in which the main engines are of Caterpillar manufacture type 3516C or equivalent and as such has requested two engine cost options be provided in respect of main engine emissions criteria - only where the following circumstance applies: If the Contractor can offer a vessel already under construction i.e. keel laid before 1st January 2021. IMO Tier II (keel laid before 1st January 2021) Caterpillar 3516C or equivalent Tier II being achieved in-engine and no exhaust after treatment required. With part completion / ready for owners sea trials due within six months of the issue of this ITT 1.10. Fuel tank capacity to be a minimum of 120 cubic metres. 1.11. Fresh water capacity to be no less than 20 cubic metres. The anticipated Contract Duration from award of Contract (Lot 1) to delivery of the vessel, following successful sea trials, will be from August 2022 to 31 January 2023 Additional information: The anticipated Contract Duration from award of Contract (Lot 1) to delivery of the vessel, following successful sea trials, will be from August 2022 to 31 January 2023. Lot 2: Supply of One New Tug Boat (Design and Build) The provision (design and build) of one new-build tug boat to meet the Council’s specification as detailed in Lot 1, apart from the main engines which must be:- IMO Tier III Caterpillar 3516E or equivalent. This option (Lot 2) to include total cost of supply and fit out of associated after treatment equipment such as but not limited to Clean Emissions Modules, DEF storage tank, dosing and monitoring control gear etc. It is recognized that the contract duration (for Lot 2) will be subject to the global supply market, therefore the provision (design and build) of one new-build tug boat to meet the Council’s specification is to be delivered subject to successful sea trials within 36 months of the award of Contract. Additional information: The anticipated Contract Duration from award of Contract (Lot 2) to delivery of the vessel, following successful sea trials, will be from August 2022 to July 2025.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Orkney Islands Council

200,000 GBP

Published 2 days ago

Orkney Islands Council

200,000 GBP

Published 7 days ago

Peel Ports Investments Limited

Published a month ago

Shetland Islands Council

350,000 GBP

Published 2 months ago

Associated British Ports

Published 4 months ago

European Marine Energy Centre (EMEC) Ltd

250,000 GBP

Published 6 months ago

European Marine Energy Centre (EMEC) Ltd

250,000 GBP

Published 6 months ago

Explore top buyers for public sector contracts

Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.

Explore over 15,000 buyers

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.