Stotles logo
Stale pre-tender

Waste Packaging & Encapsulation Plant Distributed Control System

Published

Value

7,600,000 GBP

Description

Design and build of a Distributed Control System for the Waste Packaging & Encapsulation Plant Lot 1: The Waste Packaging and Encapsulation Plant (WPEP) is a two-line process plant designed for encapsulating Flocculant (FLOC) arisings from the Enhanced Actinide Removal Plant (EARP) process, waste from the Segregated Effluent Treatment Plant (SETP) and the Effluent Plant Maintenance Facility (EPMF). The waste is encapsulated in stainless steel drums within a cement mix. Filled drums are lidded, and then monitored before being stored, initially in the WPEP Store, before being exported for longer term storage in the Encapsulated Product Stores.<br/><br/>The aim of the project is to replace the existing WPEP Distributed Control System (DCS) with a replacement control system based on modern technologies, whilst applying relevant Sellafield standards, guides and procedures. <br/><br/>The project aims to:<br/><br/>• Replace the existing DCS hardware, system software and configuration with a modern control system ensuring that the plant continues to function in the same manner <br/>• Incorporate the currently independent Drum Decontamination and Powders PLC functionality to the replacement WPEP control system<br/><br/>The operability of the replacement control system is to align, as closely as possible, to the existing control system to reduce the impact on operator training and the changeover between the two systems.<br/><br/>• The replacement control system will be installed such that the existing control system remains in situ, providing a fall-back in the event of delays or commissioning issues. However, given space constraints, it may not be possible to do this in all instances and some existing equipment may be removed prior to installing elements of the replacement control system.<br/><br/>The scope of activities are to include (but not be limited to):<br/><br/>a) Familiarisation with the existing control system to aid understanding<br/>b) The production of detailed hardware and software designs, consistent with the relevant clauses specified in the standards and capable of satisfying the requirements specified in the User Requirement Specification (URS)<br/>c) Carrying out the manufacture and assembly of all items of hardware, consistent with the relevant clauses specified in the standards and capable of satisfying the requirements specified in the URS <br/>d) Implementing structured software, consistent with the functional requirements documentation<br/>e) Production and delivery of all supporting design documents, consistent with the relevant clauses specified in the standards and as listed in the URS<br/>f) Preparation and submission of Technical Queries (TQs)<br/>g) Carrying out the detailed design and build, of a simulation model, including the production of all supporting design documentation<br/>h) Carrying out testing in accordance with the relevant clauses specified in the standards and as described in the URS<br/>i) Carrying out training in accordance with the relevant clauses specified in the standards and as described in the URS <br/>j) Delivery of the system to the location specified in the contract documentation<br/>k) Provision of support during Setting to Work and Commissioning in accordance with the URS<br/><br/>The procurement will be carried out under the Open procedure. The scope of the contract includes the design, build, test & delivery to the Sellafield site. <br/><br/>Sellafield Ltd are exploring an opportunity to hold a market engagement day allowing parties potentially interested in bidding an opportunity to access further information. If a market engagement day is organised a further PIN outlining the time, date and location would be published. Additional information: The procurement has been designed as a single lot covering the design, build, test, and delivery. Due to the nature of the requirement, keeping the scope as one single lot will allow the successful organisation to efficiently manage the full end-to-end scope of the project. A period where interested parties can submit clarification questions will be initiated upon publishing of the Contract Notice within the Atamis eSourcing Portal.

Timeline

Publish date

3 months ago

Buyer information

Sellafield Ltd

Contact:
Richard Dawson
Email:
richard.j.dawson@sellafieldsites.com

Explore contracts and tenders relating to Sellafield Ltd

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by Sellafield Ltd

Explore more open tenders, recent contract awards and upcoming contract expiries published by Sellafield Ltd.

Explore more suppliers to Sellafield Ltd

Sign up