ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement
Published
Value
Description
Design and Build of Work re. Incinerator Kiln Refractory Lining replacement for the Primary and Secondary Combustion Chambers. The scope of works will involve: • Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation. • Supply and delivery of all refractory materials and anchors including any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops. • Deconstruction of existing refractory lining and Anchors (Disposal of waste by others) • Installation of the new anchors and refractory lining as per agreed detailed design. • Management of drying out and curing of the lining. • Management of all subcontractors employed by the supplier to complete these works. • Submission of O&M containing all required details as per PIF and separate section to provide information needed for the Health and Safety File. Please see Contract Scope section in ITT document. Lot 1: The contract is for a single supplier to provide Design and Build of Work Package 5 - Incinerator Kiln Refractory Lining Upgrade to the Primary and Secondary Combustion Chambers, as per the user requirement specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF. The scope of this contract is to replace the Kiln Refractory Lining for the Primary and Secondary Incinerator Chambers to ensure that the ISO 11 incinerator remains available to operate, safe, reliable and will serve the building for a minimum of 10 years. The scope of works will involve: • Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation. • Supply and delivery of all refractory materials and anchors. o This would include any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops. • Deconstruction of existing refractory lining and Anchors (Disposal of waste by others) • Installation of the new anchors and refractory lining as per agreed detailed design. • Management of drying out and curing of the lining. • Management of all subcontractors employed by the supplier to complete these works. • On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and a separate section which provides details of the following o Brief Description of the works being carried out. o Project Risk Assessment. o Key structural principals. o Hazardous materials used. o Information on the future removal of installed plant. o H&S information about equipment provided for cleaning or maintaining installed plant. o The nature, location and markings of significant services. o Information and as built drawings of buildings, plant and equipment. o Step by step activities to carry out the works. o Lesson Learnt, challenges met and how they were overcome. o Details on how the curing burners are set up and how the ventilation and ID fans are set up to draw away the heat. • As part of the works, the supplier should also provide the following: o Provision to ensure safe access and egress to confined spaces (Gas monitors, Rescue Personnel, Outside Watchman, etc) o All provisions for the deconstruction, installation and drying / curing of the refractory, including but not limited to: All necessary machinery and equipment required for the works. Provision of lighting in the individual plant sections. Provision of transport vehicles required for the works which is not listed as part of the CDM site below. Provision of weather protection for any equipment and materials used/stored outside. Air compressor and fuel. Extraction fans and filtration to minimise dust generation within area of works. All PPE required for safe working during all works. Equipment and fuel required for drying and curing of the refractory lining. Recommend diesel burner as gas would be difficult to arrange on site. A CDM Construction site will be set up as part of the overall project which will provide for the following: • Site Supervision • HERRAS fencing and appropriate signage around CDM area • Site Office • Welfare Office including changing areas • Waste skips • Scissor lift • Fork-lift truck / telehandler • CDM documentation / inductions / daily logs / management of RAMS Additional information: As part of the tender, the supplier is to provide option costs and timescales for the following: • Completion of both chambers within a single visit based on normal working hours only. • Completion of both chambers within a single visit based on normal and extended working hours. • Completion of both chambers over two visits (i.e. one chamber per visit) based on normal working hours only. • Completion of both chambers over two visits (i.e. one chamber per visit) based on normal and extended working hours.
Timeline
Publish date
10 days ago
Close date
in 22 days
Buyer information
The Pirbright Institute
- Email:
- Procurement.Department@pirbright.ac.uk
Explore contracts and tenders relating to The Pirbright Institute
Go to buyer profileNotice topics
Source
"Find-a-Tender"To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Openclosing
Retrofit Improvements to 24 Borough Close, Cowbridge, CF71 7BN
Vale of Glamorgan CouncilPublished a day ago
- Openclosing
Tender for Minor Refurbishment of the Cardigan Ward (Renal Ward) at Morriston Hospital
NHS Wales - Shared Services PartnershipPublished a day ago
- Openclosing
Aberystwyth Arts Centre Gallery 1 Refurbishment Project
Aberystwyth UniversityPublished a day ago
- Openclosing
Contract for External Insulation and Render system, Renewables, Re-roofing and Window Renewal
City and County of SwanseaPublished a day ago
- Openclosing
Tangmere Village Centre - Changing Room Refurbishment
Tangmere Parish Council95,000 GBPPublished a day ago
- Openclosing
PS-24-87 - Construction of a Central Catering Store, Rowallan Business Park, Kilmarnock (PRJ0013458)
East Ayrshire CouncilPublished a day ago
- Openclosing
Installation of new concrete floors, External repairs, Replacement roof coverings, & Interior Redeco
Vale of Glamorgan CouncilPublished a day ago
Explore other contracts published by The Pirbright Institute
Explore more open tenders, recent contract awards and upcoming contract expiries published by The Pirbright Institute.
- Openclosing
ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement
The Pirbright Institute427,500 GBPPublished 10 days ago
- Closed
Fire Alarm and Associated Systems Maintenance Contract
The Pirbright Institute35,000 GBPPublished 3 months ago
- Closed
The Centre for Veterinary Vaccine Innovation and Manufacturing (CVIM) - Design and Build
The Pirbright Institute6,500,000 GBPPublished 4 months ago
- Closed
ISO 11 Incinerator life extension - Project Management
The Pirbright Institute87,500 GBPPublished 5 months ago
- Closed
Biological Safety Cabinet (BSCs), Fume Cupboard (FC), Laminar Flow Cabinets (LFCs) & PCR Workstation Maintenance Contract
The Pirbright Institute75,000 GBPPublished 5 months ago
- Closed
ISO 11 CHP LTHW Heat Recovery (Project Management and Detailed Design)
The Pirbright Institute130,000 GBPPublished 5 months ago
- Closed
Site Wide Environmental Monitoring System Replacement Project
The Pirbright Institute305,000 GBPPublished 9 months ago
- Closed
Site Wide Environmental Monitoring System Replacement Project
The Pirbright Institute305,000 GBPPublished 9 months ago
- Closed
Biological Safety Cabinet (BSCs), Fume Cupboard (FC), Laminar Flow Cabinets (LFCs) & PCR Workstation Maintenance Contract
The Pirbright Institute145,000 GBPPublished 9 months ago
Explore more suppliers to The Pirbright Institute
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- Her Majesty’s Passport Office (HMPO)
- London Universities Purchasing Consortium
- Broxtowe Borough Council
- Cork Institute of Technology
- In-Tend e-Tendering
- North Warwickshire and Hinckley Collaborative
- Football Foundation
- Energy Saving Trust Ltd
- South East Staffordshire and Seisdon Peninsula CCG
- Department of the Taoiseach
- Crossreach
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.