Stotles logo

Awarded contract

Published

Trecenydd Footbridge Refurbishment

58 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Current supplier

Beaver Bridges Ltd

Description

The work involved potential structural steel repairs, preparation to SA2 standard of cleanliness to bright steel and application of a three/two coat paint system over the entire footbridge and associated access steel ramps Remediation works will comprise either of the following Options individually or a combination of the two; Option 1: Footbridge remediation works as per the scope of works to be undertaken wholly in-situ of the bridge’s existing geographical location. Option 2: Footbridge remediation works to be undertaken in two part’s, simultaneously: Option 2: Part 1: Footbridge span, i.e structure spanning over traffic lanes, to be wholly removed and transported off site to a convenient location were the remediation works can be undertaken as per the scope of works. A site has been identified approximilty 1.5 miles east if the site, traveling eastward on the A469, see drawing SO901-006 for site location. Option 2: Part 2: Footbridge access ramps and steps to remain in-situ and remediation works undertaken within existing geographical location as per the scope of works. Working at height and management of traffic will be a specific hazard. Suitable temporary works such as design scaffolds (structural otherwise) will be required. Suitable planning and precaution required ensuring health and safety especially working at height and protection from hazardous processes of all who may be affected. If Option 2 is employed, suitably designed temporary structurers will be required to support cantilevering access ramps .The structural scaffolding will be designed to support the existing remaining structures and must be installed prior to lifting the main span. The contractor is to ensure any foundations and / or footing’s supporting the temporary works is suitable and satisfies the allowable ground bearing capacity. The loosening, lifting and transportation of the main span off site and subsequently returned and reconnecting must be undertaken and managed by a suitably qualified company and personal. A lifting plan must be developed and submitted for review / comment from the Client / Principal designer. All scaffolding, structural or otherwise, must be designed by a suitably competent designer who’s name and company must be supplied as part of the CPP. Additionally, calculations, design mythology and drawings ( if appropriate ) must be supplied to the Authority’s Principal Designer for review / comment prior to work commencement .CCBC will provide bridge loading / weight to inform any propping, transportation requirements. The appointed contractor or principal contractor are responsible for all temporary works design including water management and access. The contract is NEC3 Contract. This notice is to inform the market of a contract award

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Humber Teaching NHS Foundation Trust

0

Published 19 days ago

Royal Berkshire NHS Foundation Trust

7,345.12 GBP

Published 25 days ago

Conwy County Borough Council

Published 5 years ago

Conwy County Borough Council

Published 5 years ago

Conwy County Borough Council

Published 5 years ago

Caerphilly County Borough Council

Published 5 years ago

University of Edinburgh

35,731,492 GBP

Published 5 years ago

University of Aberdeen

280,000 GBP

Published 5 years ago

Argyll Community Housing Association Ltd

24,864 GBP

Published 5 years ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.