Awarded contract
Published
Trecenydd Footbridge Refurbishment
58 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Current supplier
Beaver Bridges Ltd
Description
The work involved potential structural steel repairs, preparation to SA2 standard of cleanliness to bright steel and application of a three/two coat paint system over the entire footbridge and associated access steel ramps Remediation works will comprise either of the following Options individually or a combination of the two; Option 1: Footbridge remediation works as per the scope of works to be undertaken wholly in-situ of the bridge’s existing geographical location. Option 2: Footbridge remediation works to be undertaken in two part’s, simultaneously: Option 2: Part 1: Footbridge span, i.e structure spanning over traffic lanes, to be wholly removed and transported off site to a convenient location were the remediation works can be undertaken as per the scope of works. A site has been identified approximilty 1.5 miles east if the site, traveling eastward on the A469, see drawing SO901-006 for site location. Option 2: Part 2: Footbridge access ramps and steps to remain in-situ and remediation works undertaken within existing geographical location as per the scope of works. Working at height and management of traffic will be a specific hazard. Suitable temporary works such as design scaffolds (structural otherwise) will be required. Suitable planning and precaution required ensuring health and safety especially working at height and protection from hazardous processes of all who may be affected. If Option 2 is employed, suitably designed temporary structurers will be required to support cantilevering access ramps .The structural scaffolding will be designed to support the existing remaining structures and must be installed prior to lifting the main span. The contractor is to ensure any foundations and / or footing’s supporting the temporary works is suitable and satisfies the allowable ground bearing capacity. The loosening, lifting and transportation of the main span off site and subsequently returned and reconnecting must be undertaken and managed by a suitably qualified company and personal. A lifting plan must be developed and submitted for review / comment from the Client / Principal designer. All scaffolding, structural or otherwise, must be designed by a suitably competent designer who’s name and company must be supplied as part of the CPP. Additionally, calculations, design mythology and drawings ( if appropriate ) must be supplied to the Authority’s Principal Designer for review / comment prior to work commencement .CCBC will provide bridge loading / weight to inform any propping, transportation requirements. The appointed contractor or principal contractor are responsible for all temporary works design including water management and access. The contract is NEC3 Contract. This notice is to inform the market of a contract award
Personalised AI Summary
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Royal Berkshire NHS Foundation Trust
7,345.12 GBP
Published 25 days ago
Conwy County Borough Council
–
Published 5 years ago
University of Edinburgh
35,731,492 GBP
Published 5 years ago
University of Aberdeen
280,000 GBP
Published 5 years ago
Argyll Community Housing Association Ltd
24,864 GBP
Published 5 years ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.