Stotles logo

Published

Market dialogue concerning M/R Stations

27 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Description

Energinet is in progress of preparing bid packages for detail design, fabrication, transportation, and installation on site of up to four Meter and Regulater (M/R) stations for the Danish gas transmission grid. The M/R stations having the specified design data are to be delivered at locations in DK as mentioned in section 2.4. The four MR stations are standard layout two-line stations, one line with filter, gas preheating, slam-shut, gas regulation (80 to 20 bar) metering. Second line with slam-shut, regulation and metering. Interchange arrangement between the two lines will be possible. The MR station will be divided into four rooms, one room for regulation and metering, one for the boilers, one for electricals and the last for odorizing the gas before leaving the station. As part of its preliminary work on the tender and contract strategy, Energinet has decided to arrange a market dialogue in order to gather information that may assist Energinet in its planning of the coming tender. Lot 1: Energinet in Denmark is in process of preparing bid packages for detail design, fabrication, transportation, and installation on site of up to four MR stations. The MR stations having the specified design data are to be delivered at the following locations in Denmark. • Station No. 1 having a max capacity of 33800 Nm3/h and Max/Min pressure in/out of 80 barg/20 barg will be installed on a site on the island Zealand // Expected delivery- completion at site: Mid 2023 • Station No. 2 having a max capacity of 25000 Nm3/h and Max/Min pressure in/out of 80 barg/20 barg will be installed on a site on the island Fyn // Expected delivery-completion at site: Primo 2023 • Station No. 3 having a max capacity of 4000 Nm3/h and Max/Min pressure in/out of 80 barg/20 barg will be installed on a site on the island Fyn // Expected delivery-completion at site: Primo 2023 • Station No. 4 having a max capacity of 70000 Nm3/h and Max/Min pressure in/out of 80 barg/20 barg will be installed on a site in Copenhagen // Expected delivery-completion at site: Primo 2023 All four MR stations are standard layout two-line stations, one line with filter, gas preheating, slam-shut, gas regulation (80 to 20 bar) metering. Second line with slam-shut, regulation and metering. Interchange arrangement between the two lines will be possible. The MR station will be divided into four rooms, one room for regulation and metering, one for the boilers, one for electricals and the last for odorizing the gas before leaving the station. As part of its preliminary work on the tender and contract strategy, Energinet has decided to arrange a market dialogue in order to gather information that may assist Energinet in its planning of the coming tender. Energinet wishes to conduct a market dialogue with individual meetings with interested suppliers. Energinet wishes to talk to companies which have in-depth experience and references from similar projects. Registration for the market dialogue must be made via EU-Supply no later than 12 November 2021. The market dialogue is expected to take place on the following dates: 23 November, 24 November, 25 November, 30 November, 1 December and 2 December. 3 hours are allocated to each supplier. The market dialogue meetings will be conducted via Microsoft Teams. An invitation with information on the preparation for the market dialogue meeting as well as further relevant information can be found in EU-Supply. Lot 1: Energinet in Denmark is in process of preparing bid packages for detail design, fabrication, transportation, and installation on site of up to four MR stations. The MR stations having the specified design data are to be delivered at the following locations in Denmark. • Station No. 1 having a max capacity of 33800 Nm3/h and Max/Min pressure in/out of 80 barg/20 barg will be installed on a site on the island Zealand // Expected delivery- completion at site: Mid 2023 • Station No. 2 having a max capacity of 25000 Nm3/h and Max/Min pressure in/out of 80 barg/20 barg will be installed on a site on the island Fyn // Expected delivery-completion at site: Primo 2023 • Station No. 3 having a max capacity of 4000 Nm3/h and Max/Min pressure in/out of 80 barg/20 barg will be installed on a site on the island Fyn // Expected delivery-completion at site: Primo 2023 • Station No. 4 having a max capacity of 70000 Nm3/h and Max/Min pressure in/out of 80 barg/20 barg will be installed on a site in Copenhagen // Expected delivery-completion at site: Primo 2023 All four MR stations are standard layout two-line stations, one line with filter, gas preheating, slam-shut, gas regulation (80 to 20 bar) metering. Second line with slam-shut, regulation and metering. Interchange arrangement between the two lines will be possible. The MR station will be divided into four rooms, one room for regulation and metering, one for the boilers, one for electricals and the last for odorizing the gas before leaving the station. As part of its preliminary work on the tender and contract strategy, Energinet has decided to arrange a market dialogue in order to gather information that may assist Energinet in its planning of the coming tender. Energinet wishes to conduct a market dialogue with individual meetings with interested suppliers. Energinet wishes to talk to companies which have in-depth experience and references from similar projects. Registration for the market dialogue must be made via EU-Supply no later than 12 November 2021. The market dialogue is expected to take place on the following dates: 23 November, 24 November, 25 November, 30 November, 1 December and 2 December. 3 hours are allocated to each supplier. The market dialogue meetings will be conducted via Microsoft Teams. An invitation with information on the preparation for the market dialogue meeting as well as further relevant information can be found in EU-Supply.

Unlock decision maker contacts.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Energinet

Published 3 months ago

Danmarks Tekniske Universitet - DTU

Published 4 months ago

HOFOR A/S

Published 6 months ago

Energinet

Published 7 months ago

Energinet

Published 7 months ago

I/S Vestforbrænding og datterselskaber

Published 9 months ago

Danmarks Tekniske Universitet - DTU

Published 10 months ago

Explore top buyers for public sector contracts

Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.

Explore over 15,000 buyers

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.