Awarded contract
Published
Leasing of a Laser Powder Bed Fusion 3D Metal Printer
26 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Value
500,000
Description
The School of Engineering wanted to lease a Laser Powder Bed Fusion 3D Metal Printer for a fixed term of 3 years with the option to have extended for up to an additional 2 years. The metal printer would have supported world-leading research utilising new materials and printing methods and extended the capability of the 2D and 3D printing currently undertaken within the school. Applications for metal printing can be found in aerospace, defence, automotive, healthcare, and many other industries and will lead to revolutionary new medical, electronic, mechanical, optical, acoustic, heat transfer, and sensing devices being designed and manufactured. This is due to the many advantages, including design flexibility, product customisation, and minimisation of material waste, that printing offers over subtractive manufacturing. The use of Additive Manufacturing (AM) means that geometrics are no longer constrained to the limited base stock that components are traditionally machined from. Lot 1: The School of Engineering wanted to lease a Laser Powder Bed Fusion 3D Metal Printer for a fixed term of 3 years with the option to have extended for up to an additional 2 years. The metal printer would have supported world-leading research utilising new materials and printing methods and extended the capability of the 2D and 3D printing currently undertaken within the school. Applications for metal printing can be found in aerospace, defence, automotive, healthcare, and many other industries and will lead to revolutionary new medical, electronic, mechanical, optical, acoustic, heat transfer, and sensing devices being designed and manufactured. This is due to the many advantages, including design flexibility, product customisation, and minimisation of material waste, that printing offers over subtractive manufacturing. The use of Additive Manufacturing (AM) means that geometrics are no longer constrained to the limited base stock that components are traditionally machined from. The University conducted this procurement using the Open Procedure in accordance with the requirements of the Regulations for the purpose of procuring goods described in the Specification. The University proposed to enter into a Contract for up to five years and six months. This was to be the maximum contract period. This comprised of an initial contract period of three years and six months for the provision of the equipment and initial lease term, with an optional extension period of two years additional leasing.
Personalised AI Summary
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
National Museum of the Royal Navy
36,689.64 GBP
Published 7 days ago
Broseley Town Council
8,760 GBP
Published 9 days ago
Driver and Vehicle Licensing Agency
31,463.97 GBP
Published 9 days ago
Swale Borough Council
54,163.02 GBP
Published 14 days ago
Essex County Fire and Rescue Service
89,468.96 GBP
Published 23 days ago
Nuclear Restoration Services Limited
53,695.1 GBP
Published 23 days ago
Nuclear Restoration Services Limited
27,923.7 GBP
Published 23 days ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.