Stotles logo
Unknown

2463 REPLACEMENT OF EXISTING FLUORESCENT LIGHT FITTINGS FOR NEW LED FITTINGS AT JOHN WHITEHEAD BUILDING

Published

Description

The scope of works includes the removal of all of the existing fluorescent light fittings and controls in the university’s John Whitehead Building and the design and installation of new LED light fittings and controls within the building, as per the contractor’s chosen lighting manufacture’s design and equipment installation instructions. <br /> <br />The Contractor is to perform a site survey prior to the commencement of works to assess and develop their own evaluation of the extent of the works. <br /><br />The Contractor shall also during the site survey ascertain the strip out and making good required after the replacement of the light fittings and following replacement / relocation of scene plates, switches, etc. <br /><br />The Contractor is to note that surrounding areas of the building may be kept operational during the works and as such should take care to ensure the circuit isolation process does not adversely affect these areas. Items connected to building wide systems should be isolated outside of the building working hours and should not compromise the operation of the systems in the remainder of the building. <br /><br />It is the responsibility of the Contractor to remove redundant items of equipment from site in a planned manner that considers the safety of others included in the construction team and also those in the surrounding environment. <br /><br />All redundant fluorescent tubes, light fittings, switches, controls, etc. shall be removed off as per the WEEE regulations <br /><br />The enabling works included as part of the Contractor’s scope involves but is not limited to: <br />• logistics solutions<br />• investigations and surveys<br />• hazardous material removal<br />• Temporary disconnection and safe removal of equipment and then the reinstatement after the works have been completed.<br /><br />All of the works should consider the environmental, economic, cultural and social impacts on the surrounding environment and Client. <br /><br />As the University will be in operation throughout the project the contractor will need to work flexibly with the University staff to establish and monitor the detailed program for the works. This will involve Weekly planning/monitoring meetings with the University staff to devise the detailed weekly programme, agree which rooms are being accessed and monitor/record progress achieved. <br /><br />Access to all areas will always be subject to agreement in advance by the University and on a floor-by-floor basis. It will be necessary due to restrictions on access for the contractor to make allowances to return to rooms to complete works in phases and in some cases out of hours. <br />The Contractor will need to keep a good record of the lights not replaced to ensure these are not missed when returning to floors to complete works. <br /><br />The Contractor will be required to move existing furniture and reinstate on completion, work around and protect fixed equipment and furniture. <br /><br />Damages or impact on systems outside of the scope of works caused by lack of consideration and approach to works will be the responsibility of the Contractor <br /> <br />Full details of the University’s requirements can be found in the Specification <br />

Timeline

Publish date

4 days ago

Buyer information

De Montfort University

Contact:
SEAMUS HAYES

Explore contracts and tenders relating to De Montfort University

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by De Montfort University

Explore more open tenders, recent contract awards and upcoming contract expiries published by De Montfort University.

Explore more suppliers to De Montfort University

Sign up