Installing replacement bridge and culvert over River Esk to improve fish passage and natural river f
Published
Supplier(s)
Value
Description
The key objectives of the contract are to construct 2 new water crossings to replace existing obstacles. All works must be completed before the end of June 2023 to align with project funding arrangements. REPLACEMENT BRIDGE CROSSING, River Esk The works comprise of installing a new bridge crossing over the River Esk on a private farm road to Crag Farm. The existing bridge will remain in place as the main vehicular access to Crag Farm until the new bridge is completed and the approach roads reinstated. Then the existing bridge will be removed and the river channel reinstated to a form similar to conditions upstream. The existing bridge over the River Esk (Esk 9a) provides the only vehicular means of access to Crag Farm and it must remain open throughout the works to allow milk tankers and routine farm traffic to access the farm, as well as emergency vehicles. A Traffic Management Plan will be required to be agreed with Crag Farm (who are supportive of the works). The Esk 9a bridge is a Public Bridleway, however this designation will be subject to a temporary closure order arranged by the NYM NPA for the duration of the works to prevent public access. When the new bridge is installed, the existing bridge is to be removed. Due to the bridge removal requiring direct works in the river, these works cannot commence prior to 22nd May 2023 (subject to confirmation) due to emergence of juvenile fish in the river. All activities will require installation of appropri...erosion protection comprising riprap stone at toe of bank (approx. 30 m3), rock rolls (approx. 60 m), at lower levels, and addition of biomatting (to be anchored and pinned) (approx. 120 m2), at upper bank levels and at top of bank. REPLACEMENT CULVERT, Little Fryup Beck The works comprise of the replacement of an existing twin pipe culverted crossing of a private farm track over the Little Fryup Beck with a 4m span multi-plate bottomless arch culvert: 1. Remove existing culverts and re-grade the bed of the Beck to remove the upstream build-up of sediment; 2. Cast in-situ/precast strip foundations, incorporating arch seating channel (or with fixing/load transfer system to Contractor's design, to equivalent performance); 3. Reinstate the channel bed with stone, as per design specification; 4. Re-form the channel bed between the abutments using placed stone; 5. Assemble multiplate bottomless arch culvert from pre-fabricated plates onto strip foundations; 6. Cast in-situ concrete headwall, to tie-in to foundations and steel arch; 7. The BAC shall receive compacted fill in layers to the sides and above the crown of the arch, with a C40 fibre concrete running surface formed; 8. Place rock armour to provide a tie in between the concrete headwall and reprofiled banks upstream at culvert inlet and outlet; 9. A pedestrian handrail to be fixed to the headwall; 10. The track will be reinstated either side of the culvert with a compacted stone fill running surface.
Timeline
Publish date
2 years ago
Award date
2 years ago
Buyer information
North York Moors National Park Authority
- Contact:
- Briony Fox
- Email:
- b.fox@northyorkmoors.org.uk
Explore contracts and tenders relating to North York Moors National Park Authority
Go to buyer profileSource
Contracts FinderTo save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Awarded
AVVC New External Café Kiosks & Toilet Provision
Redditch Borough Council199,000 GBPPublished 3 days ago
- Awarded
A417 Missing Link - Early Landscaping Works
National Highways Limited470,000 GBPPublished 3 days ago
- Awarded
A417 Missing Link - Reinforced Earth Structure
National Highways Limited7,500 GBPPublished 3 days ago
- Awarded
PAN2758 - Leicester Railway Station Redevelopment – Construction Contract
Leicester City CouncilPublished 3 days ago
- Awarded
Masters House Alterations and Refurbishment (A1179)
Swale Borough Council329,730 GBPPublished 3 days ago
- Awarded
Lift Maintenance, Refurbishments and Replacement
London Borough of Southwark20,740,000 GBPPublished 3 days ago
- Awarded
ENHT - New Main Entrance and Retail Development
East and North Hertfordshire NHS Trust50,000 GBPPublished 3 days ago
Explore other contracts published by North York Moors National Park Authority
Explore more open tenders, recent contract awards and upcoming contract expiries published by North York Moors National Park Authority.
- Awarded
Out and About in the North York Moors Magazine 2025
North York Moors National Park Authority14,764 GBPPublished 6 days ago
- Awarded
River Esk Little Fryup Beck Restoration Feasibility
North York Moors National Park Authority37,183 GBPPublished 11 days ago
- Awarded
Development of an Active Travel Plan or LCWIP
North York Moors National Park Authority79,500 GBPPublished 6 months ago
- Awarded
Large woody material installation and swale creation - Ryevitalise Landscape Partnership
North York Moors National Park Authority13,152.44 GBPPublished a year ago
- Awarded
Levisham Landslip Monitoring
North York Moors National Park Authority76,500 GBPPublished a year ago
- Awarded
Bransdale Conservation Management Plan
North York Moors National Park Authority49,988 GBPPublished a year ago
- Awarded
Blue Corridors Summative Assessment Evaluation
North York Moors National Park Authority11,988 GBPPublished 2 years ago
- Awarded
Mechanised Rhododendron Control Works - Kepwick Estate
North York Moors National Park Authority49,689.06 GBPPublished 2 years ago
Explore more suppliers to North York Moors National Park Authority
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- One Housing Group
- Breckland District Council and South Holland District Council
- Milton Keynes College
- Fife College
- South Of England Procurement Centre
- Liverpool City Region L E P
- Independent Police Complaints Commission
- Ferguslie Park Housing Association
- Golden Gates Housing Trust Ltd
- Children's Hearings Scotland
- St Edmund Campion Catholic School
- Priory School
- Oak Lodge Primary School
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.