Stotles logo

Awarded contract

Published

SOFIII - Advanced + Fit-Out Works @ National Maternity Hospital at St. Vincent's University Hospital Campus (WORKS CONTRACTOR and as PSCS).

71 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Close date

2024-01-26

Description

Advanced + Fit-Out Works at NMH @ SVUH Campus (Works Contractor and as PSCS). The works relate to the creation of a Single Operator Framework, to deliver a series of advanced / fit-out works in connection with the NMH relocation to the campus of St Vincent's University Hospital (SVUH). These works will consist of the construction and fit-out of a number of temporary and permanent structures, including M+E services' upgrades, at various locations both on and off the SVUH campus. Applicants should note that the general description of works provided below is not exhaustive in nature: 1. Fit-out of a new Dermatology facility; off-site; approximate floor area 1500m2. 2. Temporary single storey structure to house the temporary Catering Kitchen; approximate floor area 700m2. 3. Temporary two storey structure, located on the roof of the existing Herbert Wing Building, to house the Staff Canteen and the In-patient Ward; approximate floor area 1,600m2. 4. Fit-out of the existing ERC Building to house the Molecular Lab; approximate floor area 290m2. 5. Temporary relocation of the Waste Marshalling Yard (to a carpark area), which includes enclosed rooms, open sided storage and an open-air yard; approximate area 1,250m2 including yard. 6. Temporary two storey structure to house Purchasing Stores + Supplies; approximate floor area 800m2. 7. Temporary single storey building to house the Carpenter's Workshop; approximate area 250m2. 8. Construction of various mock-up rooms, both on and off campus. 9. Clinical and Non-Clinical Areas Refurbishment / Alterations / Reconfigurations / Extensions, consisting of the following: o Modifications to existing internal layouts o Upgrading internal finishes o Upgrading mechanical and electrical installations including associated plant o Modifications to external façade o Structural modifications o Fire improvements works 10.Site clearance works including the: o Demolition of existing buildings o Excavation works o Service diversions / installations o Asbestos / contaminated material removal. 11. Upgrades to access / internal junctions. The value of the individual works noted above may range between €2,000,000 and €20,000,000. The overall value of all the works to be undertaken under this framework will not exceed the amount of €60,000,000. Advanced + Fit-Out Works at NMH @ SVUH Campus (Works Contractor and as PSCS). The works relate to the creation of a Single Operator Framework, to deliver a series of advanced / fit-out works in connection with the NMH relocation to the campus of St Vincent's University Hospital (SVUH). These works will consist of the construction and fit-out of a number of temporary and permanent structures, including M+E services' upgrades, at various locations both on and off the SVUH campus. Applicants should note that the general description of works provided below is not exhaustive in nature: 1. Fit-out of a new Dermatology facility; off-site; approximate floor area 1500m2. 2. Temporary single storey structure to house the temporary Catering Kitchen; approximate floor area 700m2. 3. Temporary two storey structure, located on the roof of the existing Herbert Wing Building, to house the Staff Canteen and the In-patient Ward; approximate floor area 1,600m2. 4. Fit-out of the existing ERC Building to house the Molecular Lab; approximate floor area 290m2. 5. Temporary relocation of the Waste Marshalling Yard (to a carpark area), which includes enclosed rooms, open sided storage and an open-air yard; approximate area 1,250m2 including yard. 6. Temporary two storey structure to house Purchasing Stores + Supplies; approximate floor area 800m2. 7. Temporary single storey building to house the Carpenter's Workshop; approximate area 250m2. 8. Construction of various mock-up rooms, both on and off campus. 9. Clinical and Non-Clinical Areas Refurbishment / Alterations / Reconfigurations / Extensions, consisting of the following: o Modifications to existing internal layouts o Upgrading internal finishes o Upgrading mechanical and electrical installations including associated plant o Modifications to external façade o Structural modifications o Fire improvements works 10.Site clearance works including the: o Demolition of existing buildings o Excavation works o Service diversions / installations o Asbestos / contaminated material removal. 11. Upgrades to access / internal junctions. The value of the individual works noted above may range between €2,000,000 and €20,000,000. The overall value of all the works to be undertaken under this framework will not exceed the amount of €60,000,000.

Unlock decision maker contacts.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Monaghan County Council

Published 2 days ago

Scoil Muire agus Pádraig

Published 3 days ago

Wicklow County Council

Published 4 days ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.