A303 Amesbury to Berwick Down (Stonehenge)
Published
Supplier(s)
Value
Description
The scheme is an integral part of National Highway's commitment to deliver a high-performing, high-quality route along the A303/A358 corridor between the South West and South East. It will also help to conserve, reconnect and enhance the Stonehenge world heritage site (WHS), making it easier to reach and explore, as well as improving biodiversity and providing a positive legacy for nearby communities. The scheme will be approximately 8 miles (13km) long and comprises the following key components: • a northern bypass of Winterbourne Stoke with a viaduct over the River Till valley; • a new junction between the A303 and A360 to the west of and outside the WHS, replacing the existing Longbarrow roundabout; • a twin-bore tunnel approximately 2 miles (3.3km) long through the WHS; and • a new junction between the A303 and A345 at the existing Countess roundabout. Lot 1: The requirements of the scheme that will be the responsibility of the successful applicant are principally captured in the following areas: 1. Design and construction of the new works; The scheme's new works includes the design and construction of the civil, mechanical, electrical and plumbing (MEP), technology and environmental components, key features of the new works are summarised below: • Tunnel: A twin-bore tunnel, approximately 2 miles (3.3 kilometers) long beneath the Stonehenge World Heritage Site, including tunnel portals and approach structures, tunnel service buildings and plant rooms, tunnel control system and mechanical, electrical and plumbing systems • Tunnel boring machine - design, manufacture, testing, shipping and on-site assembly • Carriageway works • Bridge works to form a viaduct over the River Till, an under bridge for the B3083, a flyover at the A345 Countess Roundabout, and 4 green bridges (Parsonage Down accommodation bridge, Winterbourne Stoke accommodation bridge, A360 Longbarrow Junction & green bridge No. 4) • Carriageway and tunnel technology • Landscaping and habitat creation • Extension of Parsonage Down National Nature Reserve • Protected species mitigation measures • Ensure rights of way and private means of access • Mainline earthworks • Utilities works 2. Refurbishment, replacement and modification of existing assets; There are works required on existing assets under the current ownership of both National Highways and Wiltshire Council. Continued engagement and consultation will be required with both parties throughout the design and construction phases for these elements including: • Existing A303 de-trunking works • Demolition works and site clearance works • Modification works to existing structures 3. Maintenance and operation during construction Maintenance and operation of the existing A303 within the site boundary will be required for the duration of the construction works. The appointed Contractor will be required to liaise with National Highways, its maintenance contractors and Wiltshire Council to coordinate activities. 4. Post construction maintenance period There is an extended maintenance period (minimum of 5 years, maximum of 7 years) after construction to 'prove' the tunnel performs as intended. Maintenance is included as part of this period and the Contractor will be responsible for all elements of the infrastructure associated with the tunnel and its approaches. The appointed Contractor will be required to liaise with National Highways, its maintenance contractors and Wiltshire Council to coordinate activities and tunnel operations. The appointed Contractor will be required to fulfil the duties of Principal Designer and Principal Contractor under the Construction (Design and Management) Regulations 2015.
Timeline
Publish date
2 years ago
Award date
2 years ago
Buyer information
National Highways Limited
- Email:
- procurementa303@nationalhighways.co.uk
Explore contracts and tenders relating to National Highways Limited
Go to buyer profileNotice topics
Source
Ted (OJEU)To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Awarded
Sutton High Street Survey, Site Assessment and Scheme Design
London Borough of Sutton65,700 GBPPublished a day ago
- Awarded
PLACE625H - Winter Maintenance 2024/2025
Derbyshire County Council200,000 GBPPublished 11 days ago
- Awarded
NMWTRA A55 J24a Primrose Hill Overbridge Heat Straightening
Cyngor Gwynedd Council100,000 GBPPublished 15 days ago
Explore other contracts published by National Highways Limited
Explore more open tenders, recent contract awards and upcoming contract expiries published by National Highways Limited.
- Awarded
Godstone SEROC - Preconstruction Contract
National Highways Limited94,009.69 GBPPublished a day ago
- Awarded
T0611 Back-up power generation for Operational Technology
National Highways Limited73,183.24 GBPPublished 4 days ago
- Awarded
Technical Surveys and Testing - Structures Testing - YNE
National Highways Limited1,250,000 GBPPublished 4 days ago
- Awarded
Technical Surveys and Testing - Structures Testing - North West
National Highways Limited1,250,000 GBPPublished 4 days ago
- Awarded
Technical Surveys and Testing - Structures Testing - North West
National Highways Limited1,250,000 GBPPublished 4 days ago
Explore more suppliers to National Highways Limited
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- Office for Standards in Education, Children's Services and Skills (Ofsted)
- Breckland District Council and South Holland District Council
- Northumberland National Park Authority
- High Peak BC & Staffordshire Moorlands DC
- Northern Devon Healthcare NHS Trust
- St Stephens Parish Council
- Fís Éireann/Screen Ireland
- The Archer Academy
- TISBURY PARISH COUNCIL
- Starbank School
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.