Published
MULTI-PROJECTS AGREEMENT OF ONSHORE/OFFSHORE HVAC/HVDC EXPORT CABLE SYSTEMS
68 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Description
The MULTI-PROJECTS AGREEMENT OF ONSHORE/OFFSHORE HVAC/HVDC EXPORT CABLE SYSTEMS consists in the supply and installation of Onshore and Offshore, HVAC and HVDC, export cable systems for 8 projects on the basis of EPCIC + IMR contracts. This tender contains a scope of 6 Onshore and Offshore projects with the following technologies: - 3 projects with Onshore and Offshore 225 kV HVAC cable systems, - 3 projects with Onshore and Offshore 320 kV HVDC cable systems. The above-mentioned 6 Onshore and Offshore projects are divided into 5 lots (Lots 1 to 5) containing an overall volume of 800 km of Onshore and 1.550 km of Offshore core cable length. Besides, this tender also contains 2 Onshore and Offshore projects, divided into 2 lots (Lots 6 and 7) containing an estimated volume of 18 km of Onshore and 188 km of Offshore core cable length. Detailed description is available in Tab 2.1 of the Pre-Qualification Questionnaire (PQQ). Lot 1: Lot 1 - AO5 project (HVAC - 225 kV) Supply and installation of Onshore and Offshore, HVAC, 225 kV, export cable systems for AO5 project on the basis of EPCIC + IMR contracts. - EPCIC Scope: Engineering, Procurement, Construction, Transport, Installation/protection of Submarine cables, Commissioning, Remedy of any defect, Provision of all documents. - IMR Scope: Inspection of spares, Maintenance (refurbishment of spares) , Repair (availability of personnel to perform repair joint operations including but not limited to jointers), Documentation for maintenance purposes. Detailed description is available in the tab 2.1 Gen Instructions of the Pre-Qualification Questionnaire (PQQ). If the Applicant is a JV/Consortium or a Single company, the entity responsible for installing the submarine cable systems as well as the entity responsible for manufacturing the submarine cable systems will be expected to have a direct contractual relationship with RTE. Lot 2: Lot 2 - AO6 SUD project (HVAC - 225 kV) Supply and installation of Onshore and Offshore, HVAC, 225 kV, export cable systems for AO6 SUD project on the basis of EPCIC + IMR contracts. - EPCIC Scope: Engineering, Procurement, Construction, Transport, Installation/protection of Submarine cables, Commissioning, Remedy of any defect, Provision of all documents. - IMR Scope: Inspection of spares, Maintenance (refurbishment of spares) , Repair (availability of personnel to perform repair joint operations including but not limited to jointers), Documentation for maintenance purposes. Detailed description is available in the tab 2.1 Gen Instructions of the Pre-Qualification Questionnaire (PQQ). If the Applicant is a JV/Consortium or a Single company, the entity responsible for installing the submarine cable systems as well as the entity responsible for manufacturing the submarine cable systems will be expected to have a direct contractual relationship with RTE. Lot 3: Lot 3 - AO6 OCC project (HVAC - 225 kV) Supply and installation of Onshore and Offshore, HVAC, 225 kV, export cable systems for AO6 OCC project on the basis of EPCIC + IMR contracts. - EPCIC Scope: Engineering, Procurement, Construction, Transport, Installation/protection of Submarine cables, Commissioning, Remedy of any defect, Provision of all documents. - IMR Scope: Inspection of spares, Maintenance (refurbishment of spares) , Repair (availability of personnel to perform repair joint operations including but not limited to jointers), Documentation for maintenance purposes. Detailed description is available in the tab 2.1 Gen Instructions of the Pre-Qualification Questionnaire PQQ. If the Applicant is a JV/Consortium or a Single company, the entity responsible for installing the submarine cable systems as well as the entity responsible for manufacturing the submarine cable systems will be expected to have a direct contractual relationship with RTE. Lot 4: Lot 4 - CM1 and CM2 projects (HVDC - 320 kV + HVAC - 66 or 132 kV) Supply and installation of Onshore and Offshore, HVDC, 320 kV and HVAC, 66 or 132 kV, export cable systems for CM1 and CM2 projects on the basis of EPCIC + IMR contracts. - EPCIC Scope: Engineering, Procurement, Construction, Transport, Installation/protection of Submarine cables, Commissioning, Remedy of any defect, Provision of all documents. - IMR Scope: Inspection of spares, Maintenance (refurbishment of spares) , Repair (availability of personnel to perform repair joint operations including but not limited to jointers), Documentation for maintenance purposes. Detailed description is available in the tab 2.1 Gen Instructions of the Pre-Qualification Questionnaire (PQQ). If the Applicant is a JV/Consortium or a Single company, the entity responsible for installing the submarine cable systems as well as the entity responsible for manufacturing the submarine cable systems will be expected to have a direct contractual relationship with RTE. Lot 5: Lot 5 - AO7 project (HVDC - 320 kV) Supply and installation of Onshore and Offshore, HVDC, 320 kV, export cable systems for AO7 project on the basis of EPCIC + IMR contracts. - EPCIC Scope: Engineering, Procurement, Construction, Transport, Installation/protection of Submarine cables, Commissioning, Remedy of any defect, Provision of all documents. - IMR Scope: Inspection of spares, Maintenance (refurbishment of spares) , Repair (availability of personnel to perform repair joint operations including but not limited to jointers), Documentation for maintenance purposes. Detailed description is available in the tab 2.1 Gen Instructions of the Pre-Qualification Questionnaire (PQQ). If the Applicant is a JV/Consortium or a Single company, the entity responsible for installing the submarine cable systems as well as the entity responsible for manufacturing the submarine cable systems will be expected to have a direct contractual relationship with RTE. Lot 6: Lot 6 - Project A (HVAC - 225 kV) Supply and installation of Onshore and Offshore, HVAC, 225 kV, export cable systems for Project A on the basis of EPCIC + IMR contracts. - EPCIC Scope: Engineering, Procurement, Construction, Transport, Installation/protection of Submarine cables, Commissioning, Remedy of any defect, Provision of all documents. - IMR Scope: Inspection of spares, Maintenance (refurbishment of spares) , Repair (availability of personnel to perform repair joint operations including but not limited to jointers), Documentation for maintenance purposes. Detailed description is available in the tab 2.1 Gen Instructions of the Pre-Qualification Questionnaire (PQQ). If the Applicant is a JV/Consortium or a Single company, the entity responsible for installing the submarine cable systems as well as the entity responsible for manufacturing the submarine cable systems will be expected to have a direct contractual relationship with RTE. Lot 7: Lot 7 - Project B (HVDC - 320 kV) Supply and installation of Onshore and Offshore, HVDC, 320 kV, export cable systems for Project B on the basis of EPCIC + IMR contracts. - EPCIC Scope: Engineering, Procurement, Construction, Transport, Installation/protection of Submarine cables, Commissioning, Remedy of any defect up to the end of the Warranty Period, Provision of all documents. - IMR Scope: Inspection of spares, Maintenance (refurbishment of spares) , Repair (availability of personnel to perform repair joint operations including but not limited to jointers), Documentation for maintenance purposes. Detailed description is available in the tab 2.1 Gen Instructions of the Pre-Qualification Questionnaire (PQQ). If the Applicant is a JV/Consortium or a Single company, the entity responsible for installing the submarine cable systems as well as the entity responsible for manufacturing the submarine cable systems will be expected to have a direct contractual relationship with RTE.
Personalised AI Summary
Unlock decision maker contacts.
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Société d'aménagement de Montpellier Méditerranée Métropole
–
Published a year ago
Enedis
–
Published a year ago
Enedis
–
Published a year ago
Ville de Port-Jérôme-sur-Seine
–
Published a year ago
Awarded
Renouvellement du système de comptage des flux de voyageurs en stations de métro à correspondance
SYTRAL Mobilités
–
Published a year ago
Siège 27
–
Published a year ago
Enedis
–
Published a year ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.