Stotles logo
Awarded

NRV Culverts NM Corner

Published

Supplier(s)

Porter Plant Hire Services

Value

27,600 GBP

Description

Description of Works Refer to attachment: Natural England Specifications of Requirements - NRV Culverts NM Corner Replace three existing 450mm culverts fitted and non-return valves (flap valves) previously installed in the 1990s. Non-return valves were fitted to act as a water supply into the North Moor Corner Raised Water Level area when water levels within internal ditches are lower than external levels. Structures to allow passage of water into the raised water level area, but in an emergency can also be opened to allow evacuation of water during flood events. The wooden headwalls of the culverts are severely degraded and in places material compacted around the culvert pipes has collapsed into the field and ditch. Replacement structures are required. Each replacement culvert must be/have: • Rigid twin-walled plastic pipe • Internal pipe diameter 450mm • Pipe length 6000mm • Culvert pipe surround of geotextile membrane and clean, crushed, locally sourced stone • Motorway barrier headwalls with 450mm non-return (flap) valve (vertical component of headwall required to reach approximate depth of 3500mm to anchor the structure to the clay bed beneath the peat soils) • 12-foot metal gate with galvanised metal gate posts and wooden wings Working Method will follow: Somerset IDB Gateway Construction Culvert Sequence Guide - utilising Steel Motorway Barrier Headwalls Working area must be isolated with sheet piling and drained prior to commencement of works. Location of works: Wisteria Farm, Middlemoor Drove, North Newton. TA7 0BT. What3Words for the three culvert locations: crowds.supreme.swerving prowling.manicured.safari nuggets.rejoined.grant Additional information: To apply for this opportunity you must submit your quotation meeting the requirements detailed in the Request for Quotation (RFQ) with supporting evidence from attachments: Natural England Specifications of Requirements - NRV Culverts NM Corner, NM Corner IDB Consent Applications NRV1,2 and 3 Culverts, Somerset IDB Gateway Culvert Construction Sequence Guide, Commercial Response Template, and if required, Natural England H&S Contractor Competence. Your response must be sent to philip.thorpe@naturalengland.org.uk by 17:00pm on 15/08/24. If you have any clarification questions linked to this opportunity or the procurement process please submit these via email to philip.thorpe@naturalengland.org.uk. Please note that, unless commercially sensitive, both the question and the response will be circulated to all tenderers.

Timeline

Award date

2 months ago

Publish date

2 months ago

Buyer information

Natural England

Contact:
Philip Thorpe
Email:
philip.thorpe@naturalengland.org.uk

Explore contracts and tenders relating to Natural England

Go to buyer profile

Notice topic

To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by Natural England

Explore more open tenders, recent contract awards and upcoming contract expiries published by Natural England.

Explore more suppliers to Natural England

Sign up