Stotles logo
Awarded

Engineering Capital Delivery Programme Tier 1 Delivery Partners Framework Agreement

Published

Description

Award of contract for key Tier 1 Delivery Partner capability to deliver across 4 key lots. Lot 1 - Non-Infra Waste (East) Lot 2 - Non-Infra Waste (West) Lot 3 - Non-Infra Water Lot 4 - Infra Water/Waste Lot 1: Non-Infra Waste (East) Non-infrastructure scope includes refurbishment, replacement and provision of wastewater treatment assets including, but not limited to the following activities: • Refurbishment, replacement, and provision of new treatment facilities such as inlet works • Stormwater storage • Event duration monitors • Settlement tanks • Biological treatment • Tertiary treatment, • Sludge treatment • Reed beds • Digester roof replacement • Sewage pumping stations including pump replacement, enhanced power resilience, switchgear, and transformer replacement. • Overflows, metering, telemetry & monitoring • Switchgear • Combined Heat and Power (CHP) • Chemical dosing • Phosphorous removal, • Odour control • Supervisory Control and Data Acquisition (SCADA) • Increased power resilience • Underground assets such as sewers, rising mains, etc Lot 2: Non-infrastructure scope includes refurbishment, replacement and provision of wastewater treatment assets including, but not limited to the following activities: • Refurbishment, replacement, and provision of new treatment facilities such as inlet works • Stormwater storage • Event duration monitors • Settlement tanks • Biological treatment • Tertiary treatment, • Sludge treatment • Reed beds • Digester roof replacement • Sewage pumping stations including pump replacement, enhanced power resilience, switchgear, and transformer replacement. • Overflows, metering, telemetry & monitoring • Switchgear • Combined Heat and Power (CHP) • Chemical dosing • Phosphorous removal, • Odour control • Supervisory Control and Data Acquisition (SCADA) • Increased power resilience • Underground assets such as sewers, rising mains, etc Lot 3: Non-Infra Water The water non-Infrastructure scope includes but is not limited to the following activities: • Refurbishment, replacement and provision of new potable ground and surface water production assets such as • Enhanced slow sand filter performance • Disinfection • Surge protection • Chemical dosing • Supervisory Control and Data Acquisition (SCADA) • Run-to-waste facilities • GAC filters • UV • Pumping stations including pump replacement, enhanced power resilience, switchgear, and transformer replacement. • Metering, telemetry & monitoring • Water towers - refurbishment and replacement • Abstraction points - refurbishment, replacement, and new installations • Boreholes • Desalination • Increased power resilience • New service reservoirs • Inspection and maintenance of existing service and storage reservoirs • Underground assets including pipes, water mains, etc Lot 4: Infra Water/Waste The scope of Water Infrastructure programme includes but is not limited to the following activities: • Raw water mains - refurbishment, replacement & new installations • Trunk & distribution mains - refurbishment, replacement & new installations • New trunk mains associated with growth, distribution mains and where appropriate/specified communications pipe installation & replacement • Rehabilitation of distribution and trunk mains utilising 'no & low' dig technologies • Pressure management activities; - • Inspection and maintenance of trunk mains, aqueducts, bridges, and tunnels. • Rehabilitation and replacement of trunk and distribution mains near and crossing rail and other critical infrastructure. The scope of Wastewater Infrastructure programme includes but is not limited to the following activities - • Rising mains - refurbishment, replacement & new installations • Installation of gravity sewers • Gravity sewers - refurbishment, replacement & new installations • Rehabilitation of gravity and rising mains utilising 'no & low' dig technologies including CIPP • Pumping stations installation and refurbishment including pump replacement, enhanced power resilience, switchgear, and transformer replacement. • Sustainable urban drainage (SUDs) • Overflows, metering, telemetry & monitoring • First time sewerage • Surge protection • Rehabilitation and replacement of sewers near and crossing rail and other critical infrastructure; - gravity solutions to maintain asset health and accommodate growth together with pipe bridge inspections

Timeline

Award date

a year ago

Publish date

a year ago

Buyer information

South West Water Ltd

Contact:
Mark Mould
Email:
mmould@pennon-group.co.uk

Explore contracts and tenders relating to South West Water Ltd

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by South West Water Ltd

Explore more open tenders, recent contract awards and upcoming contract expiries published by South West Water Ltd.

Explore more suppliers to South West Water Ltd

Sign up