Tender for the supply of Reprofiling Peatland Restoration Works on Caol, Forsinard Flows (80.55ha) Lot 1: The works form part of a continuing programme of targeted forest to bog restoration which has been carried out at Forsinard by RSPB since 1997 with the long-term aim of restoring the blanket bogs of the Flows back to their pre-1970 naturally unafforested state. The site was felled to waste in 2002-2004 when the trees were between 14 and 18 years old. It then received restoration treatments in 2014-2016 for brash crushing and furrow blocking. Brash and stumps present on site from this period are very brittle due to their age. Management since was limited to the control of regenerating conifers done on several occasions, the latest between 2022 and 2025, therefore regen is not expected to be an issue for the work, apart from some material left on the ground. Re-profiling in areas previously furrow blocked with full height dams. Bog vegetation and Sphagnum moss that has colonised the drains should be removed from the drains before infilling and placed on top of the newly reprofiled surface in a step-wise progression down each furrow. Infilling will be achieved by firstly crushing down all dead tree material so that all stems and branches lie in the bottom of the furrows and below the height of the original ground surface (i.e. the section between the plough throws). The excavator will then use a bucket to pull/push stumps, and ridge vegetation and peat into furrows, keeping the vegetated turf upright. The strip of bare ground left behind from moving the ridge material into the furrow will then we covered with the furrow vegetation removed from the next section before infilling. Once a block is complete, it is then cross-tracked to smooth the surface. Cross-tracking will be achieved by driving a tracked, low-ground-pressure excavator at right angles to the plough-lines to further flatten the topography and any tree material. The aim of this process will be to level the ridged ground that resulted from the ploughing operation during historical conifer planting. This treatment will be carried out on top of existing furrow blocking.

Timeline

Publish date

a day ago

Close date

in a month

Buyer information

RSPB Scotland

Email:
central.procurement@rspb.org.uk

Explore contracts and tenders relating to RSPB Scotland

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by RSPB Scotland

Explore more open tenders, recent contract awards and upcoming contract expiries published by RSPB Scotland.

Explore more suppliers to RSPB Scotland

Sign up