Awarded contract

Published

DfI TRAM T-1148 Moylinn Footbridge Replacement

4 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Close date

2024-11-27

Description

Contract for the design, management, construction and overall successful delivery of a new combined pedestrian and cycle bridge with a total span of 45m. This will replace the previous structure that was removed in March 2023. The works are located between Roundabout No. 2 and Roundabout No. 3, A3 Lake Road, Craigavon. Irish Grid Reference: J 0537057189 Easting: 305370 Northing: 357189. The works include without limitation the provision of the following Principal Work Activities: The design, fabrication, construction, testing and commissioning of all temporary and permanent works for a new structural steel, single span truss, pedestrian and cycle bridge superstructure and reinforced concrete abutment sub-structure elements. Further ancillary works also include: • Bridge deck surfacing; • Bridge superstructure and sub-structure drainage; • Tie ins and surfacing to existing approaches. • Landscaping works; • Management of temporary pedestrian/traffic arrangements; • Public liaison; • Diversions and renewals of Statutory Undertakers apparatus where necessary; • Environmental measures. • Design ancillary works Contract for the design, management, construction and overall successful delivery of a new combined pedestrian and cycle bridge with a total span of 45m. This will replace the previous structure that was removed in March 2023. The works are located between Roundabout No. 2 and Roundabout No. 3, A3 Lake Road, Craigavon. Irish Grid Reference: J 0537057189 Easting: 305370 Northing: 357189. The works include without limitation the provision of the following Principal Work Activities: The design, fabrication, construction, testing and commissioning of all temporary and permanent works for a new structural steel, single span truss, pedestrian and cycle bridge superstructure and reinforced concrete abutment sub-structure elements. Further ancillary works also include: • Bridge deck surfacing; • Bridge superstructure and sub-structure drainage; • Tie ins and surfacing to existing approaches. • Landscaping works; • Management of temporary pedestrian/traffic arrangements; • Public liaison; • Diversions and renewals of Statutory Undertakers apparatus where necessary; • Environmental measures. • Design ancillary works

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

South Kesteven District Council

Published 3 days ago

Westmorland and Furness Council

Published 3 days ago

London Borough of Haringey

86,478 GBP

Published 4 days ago

Stirling Council

Published 5 days ago

London Borough of Haringey

460,000 GBP

Published 5 days ago

London Borough of Haringey

7,000,000 GBP

Published 6 days ago

London Borough of Redbridge

1,200,000 GBP

Published 11 days ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.